Laserfiche WebLink
SCOPE OF SERVICES <br /> STREETS— Temporary Street Sipnaze Service <br /> Contractor Name S'TPiT✓N!.1 ■Dt: Signature <br /> Contractor to perform the services and furnish the personnel, materials, and equipment to place temporary <br /> traffic signage on City streets "as required" on a scheduled and 24-hour emergency basis including overtime if <br /> required. <br /> Contractor's Labor rates (Hourly) <br /> Position Description Regular Overtime Sunday Emergency <br /> Callout <br /> tC Svpec,t;.or $ 1tz,so $ (%1 ,SCE $ 115,50 $ \"1560 <br /> rc. -iractn. $ $ 137 .5(7 $ 1`(9, $ 1l5 -So <br /> 1Rgges- $ tlz ,o \23-T,5-0 41-is ,s0 ¶ t-5 5o <br /> Contractor's Equipment <br /> Equipment Size & Description Hourly <br /> Rate <br /> Message Boards $ 22,50 <br /> Advance Warning <br /> Signs $0,10 <br /> Barricades $ O. to <br /> Traffic Cones $ bile <br /> $ <br /> i <br /> Percent of mark-up on material: 15 % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100) =$1,100 <br /> Percent of mark-up on outside equipment: G S % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment$2,000+ 10% ($200)= $2,200 <br /> Billing of hours of work will be by 1/4 Hr. 1/2 Hr. X 1 Hr. Increments (Select one) <br /> e, 43iPage <br /> pLPASANTON. <br />