My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:52:39 AM
Creation date
6/9/2015 4:09:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br /> STREETS—Fence Installation and Repairs <br /> Contractor Name: Chain Link Fence & Supply, Inc. Signature:2A 4#7, <br /> The City is requesting an experienced licensed contractor to perform routine fence installations and repairs "as <br /> required" on a scheduled and 24-hour emergency basis including overtime if required. This work could be <br /> required on any City owned or operated property, including remote areas such as creeks or canals. All types of <br /> fencing could be required including but not limited to precast walls, chain link, wood, wrought iron, vinyl, <br /> block and T post. <br /> Contractor's Labor Rates (Hourly) <br /> Position Description Regular Overtime Sunday Emergency <br /> Callout <br /> Foreperson $172.00 $258.00 $346.00 $n/a <br /> Bobcat Operator $172.00 $258.00 $346.00 $n/a <br /> Truck Driver $172.00 $258.00 $346.00 $n/a <br /> Laborer $ 172.00 $258.00 $346.00 $n/a <br /> Contractor's Equipment <br /> Equipment Size & Description Hourly <br /> Rate <br /> Truck, 10 Wheel $ <br /> Crew Truck Truck,Welder and Tools $28.00 <br /> Bobcat Truck,Trailer and Bobcat $40.00 <br /> Percent of mark-up on material: % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100) = $1,100 <br /> Percent of mark-up on outside equipment: 0 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment $2,000 + 10% ($200) = $2,200 <br /> Billing of hours of work will be by 1/4 Hr. 1/2 Hr.X 1 Hr. Increments (Select one) <br /> 39IPage <br /> pLEAS.ANTON. <br />
The URL can be used to link to this page
Your browser does not support the video tag.