My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:52:39 AM
Creation date
6/9/2015 4:09:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES. <br /> BUILDING MAINTENANCE— Window Film Installation and Repair <br /> Contractor Name:_ n adz. boa- Signature: <br /> So/ awn-sic a Wj4-nvhrs5 C., <br /> Contractor to perform the services and furnish the personnel, materials, and equipment to install and/or remove <br /> window film on City buildings and structures as directed. <br /> Contractor's Labor rates (Hourly) <br /> Position Description Regular Overtime Emergency <br /> Callout <br /> Foreperson $ $ $ <br /> Journey Rate $ $ $ <br /> Apprentice Rate $ $ $ <br /> ■i.-2.5 4. & °t' or 120 °b a + a20,no Abb, -b-D "(_ <br /> Percent of mark-up on material: /S % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000+ 10%($100)=$1,100 <br /> Percent of mark-up on outside equipment: /,f % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment$2,000+ 10%($200)=$2,200 <br /> Billing of hours of work will be by 1/4 Hr. 1/2 Hr. X 1 Hr. Increments (Select one) <br /> 29 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.