My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:52:39 AM
Creation date
6/9/2015 4:09:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br /> STREETS— Concrete and Sound Wall�Repaiir <br /> Contractor Name:George Bianchi Construction Signature: < <br /> The following outline provides a scope of work for the City's expectations regarding routine and scheduled <br /> sidewalk, curb and gutter, miscellaneous sound wall repairs and resetting of brick paving stones on City right of <br /> ways. <br /> • Removal and replacement of sidewalk per square foot to include root cutting or grinding, if necessary. <br /> • Removal and replacement of curb and gutter per linear foot, to include root cutting or grinding, if <br /> necessary. <br /> • Removal and replacement of driveway approach per square foot, to include root cutting or grinding, if <br /> necessary. <br /> • Removal of existing concrete and installation of handicap ramps per City specifications. <br /> • Rebuild-reconstruct damaged cinderblock sound wall per square foot per City specifications. <br /> • Resetting of brick paving stones per square foot per City specifications. <br /> • Contractor will perform all concrete and asphalt cutting, removing and replacement per City <br /> specifications. <br /> Scope of Work Price Unit <br /> Removal and replacement of sidewalk per square foot, including $ Square foot <br /> root cutting or grinding if necessary, less than 160 sq. ft. 17.00 <br /> Removal and replacement of sidewalk per square foot, including $ Square foot <br /> root cutting or grinding if necessary, more than 160 sq. ft. 15.00 <br /> Removal and replacement of curb and gutter per linear foot, to $ Linear foot <br /> include root cutting or grinding if necessary, less than 40'. 50.00 <br /> Removal and replacement of curb and gutter per linear foot, to $ Linear foot <br /> include root cutting or grinding if necessary, more than 40' 45.00 <br /> Removal and replacement of driveway approach per square foot, $ Square foot <br /> to include root cutting or grinding if necessary, for one driveway 20.00 <br /> 19'-23' wide. <br /> Removal of existing concrete and installation of Case A handicap $ Each <br /> ramp for one ramp. 3500.00 <br /> Removal of existing concrete and installation of Case A handicap $ Each <br /> ramp for 10 ramps 2500.00 <br /> Rebuilt/construct sections of damaged cinderblock sound wall, $ Square foot <br /> per City specifications, at 100 sq. ft. per panel. 30.00 <br /> Resetting of brick pavers per City specifications, 100 sq. ft. $ Square foot <br /> 40.00 <br /> Percent of mark-up on material: 15 % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% (.$1000)= $1,100 <br /> Percent of mark-up on outside equipment: 1 `� % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: O/utside Equipment$2,000 + 10% ($200) = $2,200 <br /> Billing of hours of work will be by 1/4 Hr. 1/2 Hr.^ 1 Hr. Increments (Select one) <br /> 38I <br /> pLEASANTON. <br />
The URL can be used to link to this page
Your browser does not support the video tag.