Laserfiche WebLink
SCOPE OF SERVICES <br /> PARKS - Trail Construction Services <br /> Contractor Name:George Bianchi Construction Signature <br /> The City is requesting an experienced and licensed contractor to perform natural surface trail construction/repair on an as- <br /> needed basis. Contractor shall be experienced in constructing both trails and trail design elements to the specifications and <br /> details from the U. S. Forest Service's "National Trails Drawings and specifications (EM-7720-103) Sept. 1996" available <br /> at www.fs.fed.us/.ftproot/pub/acad/dev/trails/trails.htm. <br /> Contractor's Labor rates (Hourly) <br /> Position Description Regular Overtime Sunday Emergency <br /> Callout <br /> Foreperson $65.00 $97.50 $130.00 $130.00 <br /> Operator $65.00 $97.50 $130.00 $130.00 <br /> Truck Driver $55.00 $82.50 $110.00 $110.00 <br /> Laborer $55.00 $82.50 $110.00 $110.00 <br /> Contractor's Equipment <br /> Equipment Size & Description Hourly <br /> Rate <br /> Excavator Bobcat 442 $60.00 <br /> Skid Steer Loader Bobcat S185 $54.00 <br /> Truck w/Hand Tools F550 Utility Truck $45.00 <br /> Wacker Jumping Jack and Viber Plate $10.00 <br /> Traffic Cones Per 100 cones $5.00 <br /> Dump Truck Peterbuilt 10-wheel dump $85.00 <br /> Compressor w/Tools Trailer Compressor, hoses, hammers $20.00 <br /> Traffic Cones listed above already $0,00 <br /> Misc.Tools Arrowboard $10.00 <br /> Remote Compactor 1 C Sheeps Foot $18.00 <br /> Percent of mark-up on material: I `t % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100) = $1,100 <br /> Percent of mark-up on outside equipment: 1 5 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment$2,000+ 10% ($200) = $2,200 <br /> Billing of hours of work will be by 1/4 Hr. 1/2 Hr.X I Hr. Increments (Select one) <br /> 48 I _ , <br /> PLEAS.ANTON. <br />