Laserfiche WebLink
SCOPE OF SERVICES <br /> PARKS-Landscape Services (Irrigation, Planting and General Construction <br /> Contractor Name:.Mike Davis Landscape Services Signature: <br /> The City is requesting an experienced and licensed, (C-27 required) contractor to perform routine landscape <br /> construction, playground apparatus installation, and renovation work in the City parks and street median areas <br /> on an as-needed basis. All work is to be performed to current City Standards and Specifications dated January <br /> 2011. Rates are to be on-site productive time only and are to include any clean up and disposal costs due to <br /> work. <br /> Contractor's Labor rates (Hourly) _ <br /> Position Description Regular Overtime Sunday Emergency <br /> Cahoot <br /> Foreperson $38.50 $57.75 $57.75 $38.50 <br /> Operator $47.00 $70.50 $70.50 $47.00 <br /> Laborer/Pipe Layer $24.75 $37.12 $37.12 $24.75 <br /> Truck Driver $36.00 $s4.00 $54.00 $36.00 <br /> Construction Laborer $28.50 $42.75 $42.75 $28.50 <br /> Light Carpentry $46.75 $70.15 $70.15 $46.75 <br /> Concrete Finisher $42.50 $63.75 $63.75 $42.50 <br /> $ $ $ $ <br /> ( Contractor's Equipment <br /> ` Equipment Size& Description Hourly <br /> Rate <br /> Skid Steer Loader 770 Bobat $65.00 <br /> Excavator Case 24"Bobcat $75.00 <br /> Backhoe Loader 580 Case' $125.00 <br /> Truck&Tools F-150 and all necessary tools to handle general landscape maintenance $80.00 <br /> Compressor w/Tools Ram $95.00 <br /> Wacker $40.00 <br /> Pumps Trash Pump 1'12 Hose $42.00 <br /> Arrow Board $42.00 <br /> Traffic Cones 30+cones $40.00 <br /> Barricades 10+A-frames $40.00 <br /> Dump Truck $125.00 <br /> Concrete/Asphalt <br /> $60.00 <br /> Saw <br /> Misc. Tools Saws and hand tools $40.00 <br /> $ <br /> Percent of mark-up on material: 5 % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100)= $1,100 <br /> Percent of mark-up on outside equipment: 1 5 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment $2,000 + 10% ($200) =$2,200 <br /> Billing of hours of work will be by 1/4 Hr. X 1/2 Hr. 1 Hr. Increments (Select one) <br /> 45IPage <br /> efatnn <br /> PLEASANTON. <br />