My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:52:39 AM
Creation date
6/9/2015 4:09:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br /> BUILDING MAINTENANCE HVAC Repairs <br /> Contractor Name: Mike Fiandor Signature: 4,4 r <br /> Contractor will repair and/or replace Heating, Ventilation and Air Conditioning on City buildings and structures <br /> "as required" on a scheduled and 24-hour emergency basis including overtime if required. <br /> Contractor's Labor rate(Hourly) <br /> Position Description Regular Overtime Emergency <br /> Callout <br /> Foreperson $ $ $ <br /> Journey Rate $115.00 $172.50 $115.00 regular hours <br /> Apprentice Rate $ $ $$172.50 after <br /> hours,weekend or holiday <br /> Percent of mark-up on material: 15 % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100) = $1,100 <br /> Percent of mark-up on outside equipment: 5 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment $2,000+ 10% ($200) = $2,200 <br /> Billing of hours of work will be by X 1/4 Hr. 1/2 Hr. 1 Hr. Increments (Select one) <br /> 20 ! Page <br /> pLFASANTON. <br />
The URL can be used to link to this page
Your browser does not support the video tag.