My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
060215
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 12:02:17 PM
Creation date
5/28/2015 9:51:10 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2015
DESTRUCT DATE
15Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARK RESTROOM <br /> DEEP CLEANING SPECIFICATIONS CONT. <br /> ✓ All minors and frames shall be washed with appropriate window cleaning solution. No <br /> streaks or wipe marks shall be visible when dry. <br /> ✓ All faucets shall be operated to confirm proper operation. If found deficient in any way, <br /> a report must be made to the City Representative. <br /> TOILET/STALL <br /> ✓ Caulk joint from wall to toilet shall be scrubbed to remove any build-up or mildew. <br /> ✓ The entire bowl and seat assembly will be thoroughly scrubbed,including under the <br /> seat, behind the hinges, under the bowl, the aft wall flange, and any other part not <br /> specifically mentioned. <br /> ✓ Any water spots will be removed and the chrome will be polished to a high luster. <br /> ✓ Any"splatter" on any surface from using the toilet or urinal shall be thoroughly scrubbed <br /> and disinfected. <br /> ✓ All toilets shall be operated to confirm proper operation. If found deficient in any way, a <br /> report must be made to the City Representative. <br /> ✓ All urinals shall be operated to confirm proper operation. If found deficient in any way,a <br /> report must be made to the City Representative. <br /> FLOOR <br /> ✓ The floor will be swept so as to be free of dirt, paper products or debris of any kind, <br /> before work begins. <br /> ✓ The entire floor shall be foamed with a city approved disinfectant and allowed the correct <br /> "Contact Time" so maximum efficacy will be achieved. The residue will be washed out <br /> using the minimum amount of water possible and the floor squeegeed thy. <br /> ✓ Every area of the floor shall be thoroughly cleaned and disinfected. <br /> ✓ The floor shall be left free from standing water when service is complete. <br /> Page 11 of 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.