My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
060215
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 12:01:04 PM
Creation date
5/28/2015 9:18:41 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2015
DESTRUCT DATE
15Y
DOCUMENT NO
8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
recommended a reduced, phased fee increase. The development fees that are <br /> collected, while not sufficient to fund all identified regional projects, may be used as a <br /> local match when pursuing other state and federal funding sources. In addition to the <br /> reduced overall collection target, the TVTC recommendation authorizes a fee increase <br /> to 25% of the maximum allowable rate starting in July 2015, increasing to 35% of the <br /> maximum allowable rate in July 2016. The cap for retail use would be 15% of the <br /> maximum allowable rate. This cap supports and promotes the retail development, <br /> which has less of a regional roadway impact than the other development types used in <br /> the fee. <br /> These rates produce a fee increase ranging from 44% for industrial development to <br /> 111% for retail. While these fee increases are sizable compared to today's fee, they are <br /> only a portion of what is needed to fully fund the TVTC projects and substantially less <br /> than what is supported by the nexus study. Attachment 2 fully outlines the proposed <br /> new fee structure. <br /> The TVTC Technical Advisory Committee worked directly with the development <br /> community on this effort, starting with a kick-off public outreach meeting directly <br /> advertised to over 200 developers. The development community was initially concerned <br /> about a fee increase and the timing of fee imposition. In response to feedback, and <br /> through continuous dialog and additional meetings with the development community, <br /> the TVTC approved a fee structure and schedule endorsed by the development <br /> community on June 19, 2014. <br /> The TVTC Fee was first approved by resolution in 1998. The attached resolution <br /> supersedes the original resolution. There were multiple minor modifications needed in <br /> all sections of the 1998 resolution to reflect changes in the TVTC operation and the <br /> projects. Creating an entirely new resolution that uses most of the original language <br /> was a cleaner way to present the TVTD Fee. The original resolution is included as <br /> Attachment 4. <br /> Submitted by: Fisca eview: Approve by: <br /> Steve Kirk atrick, Tina Olson Nelson Fialho <br /> Acting Director of Director of Finance City Manager <br /> Community Development <br /> Attachment 1 — List A and List B projects <br /> Attachment 2 — New Fee Structure <br /> Attachment 3 — 2015 TVTD Fee Resolution <br /> Attachment 4 — Resolution 98-90 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.