Laserfiche WebLink
ROCKFORD PL OAKTREE FARM DR END <br /> SASSAFRAS CT OAKTREE FARM DR END <br /> WAR GLORY PL OAK TREE FARM DR END <br /> YEARLING CT WAR GLORY PL END <br /> AMANDA PL BERNAL AVE END <br /> ANGELA PL EAST ANGELA ST END <br /> PAMELA PL BERNAL AVE END <br /> ROSELMAPL BERNAL AVE END <br /> GENEVIEVE PL MIRADOR DR END <br /> SONOMA DR SUNOL BLVD MISSION DR <br /> SECOND ST NEAL ST ABBIE ST <br /> THIRD ST NEAL ST EAST ANGELA ST <br /> THIRD ST EAST ANGELA ST ABBIE ST <br /> ABBIE ST FIRST ST JUST PAST WHITING ST <br /> VALLEY AVE CASE AVE SUNOL BLVD <br /> MAVIS DR VINEYARD AVE ROWELL LN <br /> MAVIS CT ROWELL LANE END <br /> ROWELL LN MAVIS DR END <br /> ORION CT ROWELL LANE END <br /> 110'E/O CRESTABLANCA <br /> BERATLIS PL CRESTABLANCA DR DR <br /> CRESTABLANCA DR CRELLIN RD MONTEVINO DR <br /> FINOVINO CT CRESTABLANCA DR END <br /> GRAY FOX CR CRELLIN RD GRAY FOX CR <br /> GRAY FOX CT GRAY FOX CR END <br /> FOXBROUGH PL GRAY FOX CR END <br /> DOROTHEA CT FOOTHILL RD END <br /> FOOTHILL PL FOOTHILL RD END <br /> FOOTHILL LANE FOOTHILL PL END <br /> Pavement Repair This construction method involves removing 4" or 6" thick of the <br /> existing pavement section as identified in the field by the Engineer as pavement <br /> distressed areas, replacing a full depth of hot mix asphalt concrete with the same <br /> thickness that was removed, and compacting the asphalt concrete to City standards. <br /> Crack Sealing: This construction method involves cleaning the remaining <br /> pavement cracks in preparation for applying a joint sealant and squeegeeing the applied <br /> sealant so that the material is flush with the existing asphalt concrete surface. <br /> Budget <br /> The estimated total expenditure for this project is $2,780,000 including a 9% construction <br /> contingency ($227,995), video detection equipment ($23,698) and surveying work for <br /> future resurfacing ($12,125). See Attachment 3 for a funding and expenditures summary. <br /> This project is an annual project funded as part of the 2014/15 Capital Improvement <br /> Program. Funding for this project includes Gas Tax, Measure B, and Vehicle Registration <br /> Fee and Streets CIP funds. Staff recommends the transfer of $80,000 from the Annual <br /> Slurry Sealing project, CIP No. 145004 to complete the funding for this project. <br /> Page 5 of 6 <br />