Laserfiche WebLink
PART B <br /> AN ESTIMATE OF THE COST OF THE MAINTENANCE <br /> 2015-2016 <br /> LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br /> NO. 1993-1 WINDSOR <br /> CITY OF PLEASANTON <br /> A. Landscaping (maintenance): <br /> 1. Tapestry Way Area A <br /> 2. Creekside Area B <br /> 3. Entry Creekside Area C <br /> $13,805.00 <br /> B. Water <br /> 1. All Planting $8,600.00 <br /> C. Power <br /> 1. 2 Controllers $215.00 <br /> D. Reserve/Long-Term Replacement Fund for scheduled long-term <br /> replacement of various district improvements (see note) $589.90 <br /> E. City of Pleasanton Administration Fee $650.00 <br /> SUBTOTAL $23,859.90 <br /> County Fees for Collection of Assessments $405.90 <br /> GRAND TOTAL $24,265.80 <br /> Assessment per Unit (90 units) $269.62 per year <br /> Note: <br /> There is currently no reserve for Lighting and Landscape Maintenance District 1993-1, Windsor, <br /> as a significant re-landscaping and irrigation renovation project was undertaken in 2006, and <br /> wrought-iron fence repair and repainting was performed in 2009. Reserve/replacement funds <br /> will be held in an interest bearing account until needed for future repairs or replacement of entry <br /> walls, signage, irrigation systems, landscaping or other District features. <br /> 4 <br />