Laserfiche WebLink
P15-0165, 5020 Franklin, LLC. <br /> Application for Design Review approval to: (1) remove six on-site parking spaces for the <br /> construction of a new trash enclosure on the north side of the property; (2) change the <br /> color of the building; and (3) construct an approximately 280-square-foot addition to the <br /> front (east) of the building, a new six-foot tall wall, and related site improvements at <br /> 5020 Franklin Drive. <br /> Approved. (10 days) <br /> PUD-87-19-04M, William and Lydia Yee <br /> Application for PUD Minor Modification approval to amend, clarify, and correct <br /> administrative errors to the conditions of approval for the approved Planned Unit <br /> Development (PUD-87-19-04M) for four custom single-family home lots located at <br /> 4100 Foothill Road. <br /> Approved. (13 days) <br /> PUD-81-30-79D-01M, Matt DavislWatry Design, Inc. <br /> Application for PUD Minor Modification to the approved Development Plan for <br /> 5860 Owens Drive to: (1) construct a two-level parking structure and related site <br /> improvements; (2) allow the proposed parking structure to be set back 13 feet, 8 inches <br /> from the rear property line where 15 feet is normally required and 20 feet from the side <br /> property line where 25 feet is normally required; and (3) allow a three-foot deep <br /> landscape planter adjacent to the front (east) elevation of the proposed parking <br /> structure where nine feet is normally required. <br /> Approved. (13 days) <br /> Planning Commission, April 22, 2015 <br /> Commissioners Present: Nancy Allen, Jack Balch, David Nagler, Gina Piper, and <br /> Herb Ritter <br /> Commissioner Absent: Greg O'Connor <br /> P15-0142. Larry and Robert Dondero <br /> Application for Design Review approval to construct an approximately <br /> 4,503-square-foot, two-story commercial building at 725 Main Street. Zoning for the <br /> property is C-C (Central-Commercial), Downtown Revitalization, Core Area Overlay <br /> District. <br /> This item has been continued to the May 13, 2015 meeting at the request of the <br /> applicant. <br /> Page 2 of 3 <br />