My WebLink
|
Help
|
About
|
Sign Out
19
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
042115
>
19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:50:16 PM
Creation date
4/15/2015 11:16:42 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2015
DESTRUCT DATE
15Y
DOCUMENT NO
19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 3 <br /> RESOLUTION NO. <br /> A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PLEASANTON <br /> ADOPTING A FINAL ADDENDUM TO THE INITIAL STUDY/MITIGATED NEGATIVE <br /> DECLARATION FOR THE RECYCLED WATER PROJECT <br /> WHEREAS, on September 16, 2014, by Resolution No. 14-710, the City of Pleasanton <br /> City Council adopted a Final Initial Study/Mitigated Negative Declaration for the Recycled Water <br /> Project for the construction of up to approximately 22 miles (115,200 linear feet) of 6-inch to 18- <br /> inch pipeline as well as approximately 3.2 miles (16,500 lineal feet) of existing pipeline that will <br /> be repurposed from abandoned or existing potable pipelines (Proposed Project) in accordance <br /> with the requirements of the California Environmental Quality Act (CEQA) and state and local <br /> guidelines implementing CEQA; and <br /> WHEREAS, after incorporating design efficiencies into the pipeline infrastructure for the <br /> Proposed Project, this resulted in the addition of 720 feet of new pipeline as well as the <br /> repurposing of an additional 9,850 feet of existing pipeline into the recycled water system, and <br /> the City, as the lead agency under CEQA, prepared an Addendum to the Initial Study/Mitigated <br /> Negative Declaration which was adopted by the City Council on January 15, 2015 by Resolution <br /> No. 15-730; and <br /> WHEREAS, after adoption of the Addendum in January 2015, the City voluntarily <br /> provided for a 14-day comment period and received one comment, a letter from Caltrans <br /> regarding the Proposed Project. Caltrans staff asked for graphics regarding where the <br /> Proposed Project would intersect Caltrans right-of-way along Dublin Blvd. and Fallon Rd. City <br /> staff provided clarification that the Proposed Project will not take place within any Caltrans right- <br /> of-way at Dublin Blvd. or Fallon Rd.; and <br /> WHEREAS, the City has prepared a Final Addendum to the Initial Study/Mitigated <br /> Negative Declaration for the Proposed Project which provides clarification to Caltrans and <br /> concludes that the proposed pipeline alignment changes will not result in any new significant <br /> impacts, substantially increase the severity of the previously disclosed impacts or involve any of <br /> the other conditions related to changed circumstances or new information that can require a <br /> subsequent or supplemental EIR under Public Resources Code §21166 and CEQA Guidelines <br /> § 15162 beyond hose impacts and conditions already identified in the City's Final Initial <br /> Study/Mitigated Negative Declaration; it therefore is appropriate for the City to approve the <br /> proposed changes to the Proposed Project. <br /> NOW, THEREFORE BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF <br /> PLEASANTON DOES RESOLVE, DECLARE, DETERMINE AND ORDER THE FOLLOWING: <br /> SECTION 1. The City Council has: (1) independently reviewed and analyzed the <br /> CEQA Final Addendum and other information in the record and has considered the information <br /> contained therein prior to acting upon or approving the Proposed Project; (2)the CEQA Final <br /> Addendum to the Initial Study/Mitigated Negative Declaration prepared for the Proposed Project <br /> has been completed in compliance with CEQA and is consistent with State and local guidelines <br /> implementing CEQA; and (3)the Final Addendum represents the independent judgment and <br /> analysis of the City as lead agency for the Proposed Project. The City designates the City's <br />
The URL can be used to link to this page
Your browser does not support the video tag.