Laserfiche WebLink
B. Existing customers and/or existing development consisting of cemeteries,golf courses, parks, <br /> greenbelts, landscaped streets, landscaped medians, highway landscaped areas, and landscape irrigation <br /> uses in industrial and commercial sites, as well as common areas of residential sites. <br /> C. Those sites described in A and B, above, located in the recycled water use area. <br /> 14.20.040 Process for New Development. <br /> 1. All new development within the recycled water use area shall use recycled water for appropriate <br /> landscape irrigation. The city's determination of appropriate landscape irrigation uses shall be based on <br /> the need for isolated irrigation water meter(s), and the standards for recycled water contained in Title <br /> 22 of the California Code of Regulations, Article 3 Uses of Recycled Water, Sections 60304 and 60305, as <br /> amended. Planning, design, and construction in new development shall incorporate recycled water <br /> facilities in accordance with the most current version of the city's Recycled Water Standard <br /> Specifications and the city's Recycled Water Use Guidelines, and such facilities shall be connected to the <br /> City's recycled water system and use city recycled water service. <br /> This requirement for all new development within the recycled water use area to use recycled water for <br /> appropriate landscape irrigation shall not apply when the City Engineer,or her or her designee, <br /> determines that: <br /> (a) Such use could pose a potential threat to public health, safety, and welfare,and/or the <br /> protection of the environment. <br /> (b) Such use is not among the list of allowable uses as specified under State law,and/or are not <br /> included in the permitted uses as issued within the City's recycled water distribution permit from the <br /> State Water Quality Control Board. <br /> 2. Compliance with the requirements of this section may be imposed as a condition of approval for any <br /> new development entitlement and shall be a condition precedent to the city's provisions of new potable <br /> water services to new development within the recycled water use area. <br /> 3. The applicant for a new development for which recycled water service is otherwise required by this <br /> chapter may seek a written determination by the City Engineer or his or her designee (collectively"City <br /> Engineer")for reconsideration of such recycled water requirement. The applicant's request for such <br /> determination shall be in writing and shall set forth with sufficient supporting information at least one of <br /> these criteria: <br /> (a) not economically feasible because of distance from, or access to, available or planned <br /> recycled water sources; <br /> (b) landscape irrigation demands within the new development are minor relative to overall <br /> water demands; or <br /> (c) inadequate recycled water supply is available to service the demand. <br /> After receipt of such request for reconsideration,the City Engineer may ask for additional written <br /> information from the applicant. After receipt of all reasonably requested information,the City Engineer <br /> shall issue a written determination in thirty (30) days. <br />