My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
042115
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:48:06 PM
Creation date
4/15/2015 11:13:55 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2015
DESTRUCT DATE
15Y
DOCUMENT NO
4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORTSMOUTH CT PIMLICO DR END <br /> HUDSON CT GUTHRIE ST END <br /> DISCUSSION <br /> This project is part of the City's preventative maintenance program and is expected to <br /> extend the life of the streets, thereby reducing long-term operation and maintenance <br /> costs. This project also improves roadway surface traction and ride quality. The project <br /> has been completed to the City's satisfaction and is ready for City Council acceptance. <br /> The final construction contract cost including contract change orders was <br /> $2,881,088.61. The following change orders resulted in a net increase of $241,767.93 <br /> to the contract amount: <br /> e Increase of $99,993.38 for roadway repair at fourteen locations along West Las <br /> Positas Boulevard between DMV and Stoneridge Drive. The repair was not <br /> included under the original construction contract, however excessive roadway <br /> sinking at these locations warranted the immediate repair to provide a safe <br /> driving condition for motorists. Pavement repair (6,800 square feet), roadway <br /> milling and leveling with asphalt concrete (550 tons), and striping were included <br /> as part of the repair. <br /> • Increase of $16,884.60 for emergency roadway repair on Arlington Drive at <br /> Carriage Drive as the result of a broken water main. This repair was paid for <br /> using Water Enterprise funds. <br /> o Increase of $6,470 for speed hump and signage installation on Black Avenue as <br /> requested by the Traffic Division as a safety measure near Walnut Grove School. <br /> • Increase of $2,600 for additional changeable message signs required for closure <br /> of on and off ramps on 1-680 @ Sunol Boulevard during construction. <br /> • Increase of $115,819.95 as the result of an increase in quantity of contract line <br /> items such as asphalt concrete, pavement repair, leveling, crack seal, paving <br /> fabric, and striping as compared to the engineer's estimate of quantities <br /> (balancing change order). <br /> Alameda County Transportation Commission (Alameda CTC) has implemented the <br /> Time of Use policy for Measure B funding and VRF funding. In order not to jeopardize <br /> this funding, we must use a specified amount of each type within the fiscal year. <br /> Because the majority of this funding has been programmed into projects that are not <br /> currently under construction, staff is recommending that Measure B and VRF funding be <br /> used for the Annual Resurfacing project, CIP No. 135003. Gas Tax and Streets CIP <br /> funds, both of which do not have restrictions on the time of use, will be switched out with <br /> Measure B and VRF funds from other projects (Annual Resurfacing #145003, Annual <br /> Slurry Sealing #145004, Annual Curb/Gutter Replacement #145009 and Annual <br /> Sidewalk Maintenance #145012). Total funding for each project will remain the same <br /> as Council previously authorized, but funding sources will be switched. Each of these <br /> projects is eligible to use both Gas Tax and Streets CIP funding. <br /> The final project funding and expenditures are summarized in Attachment 1 to this <br /> report, indicating total project expenses of $2,890,177 and a balance of $30,261 <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.