Laserfiche WebLink
37. In accordance with Climate Action Plan Measure TDM2-10, the project shall provide <br /> dedicated parking spaces for carpool, vanpool, alternative-fuel and car-share vehicles. <br /> 38. In accordance with Climate Action Plan Measure EC1-1, the project shall meet the LEED <br /> "Certified" rating level and incorporate shade trees, light-colored roofing, or energy <br /> efficient landscaping lighting. Alternative measures may be proposed and are subject to <br /> the review and approval of the Director of Community Development. <br /> 39. In accordance with Climate Action Plan Measure EC1-3, the project shall provide <br /> parking lot shade trees. <br /> 40. In accordance with Climate Action Plan Measure EC4-4, the project shall incorporate <br /> solar tubes, skylights, and other daylighting systems within the building design. Said <br /> systems shall be identified on plans submitted to the Building and Safety Division for <br /> permits. <br /> 41. In accordance with Climate Action Plan Measure ER2-3, the project shall incorporate <br /> distributed generation (e.g. one of the following: photovoltaic, solar thermal, solar hot <br /> water, or solar cooling), and/or provide bloom box or other fuel cell technologies. Said <br /> measure(s) shall be identified on plans submitted to the Building and Safety Division for <br /> permits. <br /> 42. In accordance with Climate Action Plan Measure ER2-5, the project shall include a solar <br /> grid to power one or more EV charging stations. <br /> 43. In accordance with Climate Action Plan Measure SW2-12, the project shall incorporate <br /> adequate space and logistics for handling of recyclable and compostable materials. <br /> 44. In accordance with Climate Action Plan Measure WA1-7, the project shall incorporate a <br /> water-saving landscape plan that includes xeriscaping and drought-tolerant planting <br /> instead of lawns. Plans submitted to the Building and Safety Division for permits shall <br /> include a final planting plan that incorporates this measure. <br /> 45. In accordance with Climate Action Plan Measure WA3-2, the project shall utilize <br /> reclaimed wastewater. <br /> 46. In accordance with Climate Action Plan Measure WA-3-4, the project shall incorporate <br /> rain harvesting. Acceptable methods to achieve this measure include directing roof <br /> leaders into landscaping areas, and using recycled water for irrigation purposes in lieu of <br /> potable water. <br /> Stoneridge Drive Specific Plan Amendment/Staples Ranch Project <br /> Mitigation Monitoring and Reporting Plan <br /> 47. The subject project shall be implemented as required by the EIR and Mitigation <br /> Monitoring and Reporting Plan (MMRP). All mitigation measures of the Stoneridge Drive <br /> Specific Plan Amendment/Staples Ranch EIR are hereby incorporated by reference and <br /> shall be implemented as required by the EIR and MMRP. All traffic fees to which the <br /> property may be subject to, as set forth in the MMRP, shall be paid prior to issuance of a <br /> building permit. If any of the conditions of approval conflict with any applicable EIR <br /> mitigation measures, the requirements of EIR mitigation measures apply. <br /> 14 <br />