Engineering Services Fee Comparison Chart
<br /> Five City Fee
<br /> Pleasanton Average _ Livermore Dublin San Ramon Fremont Walnut Creek
<br /> (Current) (Proposed)
<br /> Encroachment Permit $25 permit $30 permit $166 permit $90 permit $104 permit $150/hr permit $150 permit $185/hr
<br /> (Typical dri eway) $90 insp $90 insp $313 insp $220 insp $366 insp (two hr min) $575 insp permit renew
<br /> (min) (min) $120/hr insp (min) $164/hr insp
<br /> (two hr min)
<br /> Final Map Review $600+ $4,500+ T&M T&M $2,000+ T&M T&M
<br /> $150/lot+
<br /> $150/hr in
<br /> excess of
<br /> $50/lot $30/lot T&M $7,500 $222/hr $2000 $15,000 $185/hr
<br /> deposit deposit
<br /> Improvement Plan Check $20,000 $30,000 $39,475 T8M $31,250 min T&M T&M
<br /> + 150/hrbr
<br /> additional staff
<br /> (Based on a project with 2% 3% T8M sliding scale $222/hr hrsm $15,000 $185/hr
<br /> $1,000,000 of improvements) deposit
<br /> Construction Inspection $40,000 $50,000 $77,250 T&M T&M T&M $80,000
<br /> (Based on a project with 4% 5% T&M sliding scale $158/hr $120/hr $31,000 8%
<br /> $1,000,000 of improvements) (two hr min) deposit
<br /> (3%of the
<br /> improvement
<br /> cost+$1,000)
<br /> 'Average does not include Pleasanton
<br /> Calculated at 3.5%of the first$250k and$3%of the remaining$750k
<br /> LPFD Fee Comparison Chart
<br /> Five City
<br /> Fee San Walnut
<br /> LPFD-Pleasanton Average Livermore' Dublin" Ramona" Fremont'" Creek
<br /> (Current) I (Proposed)
<br /> LPFD Fire Prevention Services
<br /> Fire Code-Construction
<br /> Fire Sprinkler System,
<br /> Tenant Improvement,21-100 Heads $350 , $740 $744 $740 $635 $845 $528 $972
<br /> Fire Sprinkler System,
<br /> New Construction, 100 Heads $500 $870 $940 $870 $635 $989 $624 $1,580
<br /> Underground Fire Main,
<br /> with6 Hydrants $475 $1,140 $1,123 $1,140 $1,069 $840 $864 $1,700
<br /> Fire Alarm System,
<br /> 16-50 device' $255 $870 $920 $870 , $635 $797 $1,188 $1,110
<br /> Pre-Engineered System $405 $360 $349 $360 $344 $487 $192 $362
<br /> LPFD Are Prevention Services
<br /> Annual Inspections&CUPA Fees
<br /> No Fee
<br /> Repair Garage(small) Structure $850 $1,057 $850 $1,382 $937 $772 $1,345
<br /> No Fee
<br /> Gas Stationw/3 Underground Storage Tanks . Structure . $2,380 $3,487 $2,380 $3,081 $4,159 $3,005 $4,811
<br /> No Fee
<br /> Place of Assembly Structure $400 $247 $400 $149 $197 $159 $330
<br /> No Fee
<br /> Shop/Occupancy w/2 Fire Permits Structure $560 $535 $560 $298 $415 $248 $1,154
<br /> $51-$100 $150 $177 $150 $161 $237 $96 $243
<br /> Hourly Rates for Services Inspection Inspection Inspection Inspection Inspection Inspection CUPA/Insp Inspection
<br /> ' Livermore includes both CUPA and Fire Code fees,and are only Jywith 100%cost mcowry that includes trawl and etppon personnel.
<br /> 2 Fremont is both Fire and CUPA Agency,similar to Livermore-Pleasanton Fire Pretenton
<br /> 3 Fremont,San Ramon and Dubin charge for Plan Resiew services and Inspections at T&M after the be for the minimum time is exceeded.
<br /> 4 The CUPA program in DuLlin,San Ramon and Walnut Creek is not done by the fire agency,but by the Heats deparbnera
<br /> Businesses receive inspections and hills from two agencies.
<br /> Page 8 of 9
<br />
|