My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:12 PM
Creation date
4/1/2015 3:36:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> IV. BUILDING AND SAFETY DIVISION <br /> When a plumbing plan is submitted for review, Plumbing Plan Review fee. Permit Fee <br /> 1-hr min* <br /> ADDITIONAL PLUMBING PLAN REVIEW FEE: <br /> Applied to all plan check correction lists in excess of two revised or resubmitted plan Time& Material <br /> submittals,or for revisions to previously approved plans. <br /> 1-hr min* <br /> PLUMBING PERMIT FEES <br /> Residential Plumbing Permits <br /> Any permit for Plumbing work in a one-or two-family dwelling, or within a multi-family <br /> unit, not in conjunction with an associated Building Permit. $85.00 <br /> Non-Residential Plumbing Permits <br /> Any permit for Plumbing work in a multi-family or non-residential building not <br /> specifically itemized, or in conjunction with an associated Building Permit. $85.00 <br /> Sewer piping&vents, water piping, gas piping, fixtures and appliances or other plumbing <br /> requiring a permit not within a residential unit, each 1000 square feet of floor area. $85.00 <br /> Fats, Oil or Grease (FOG) interceptor or other pre-treatment clarifier, each $340.00 <br /> Stbrmwater piping or treatment systems $340.00 <br /> E. Grading Fees <br /> Plan Review Permit <br /> Less than 50 cubic yards Exempt Exempt <br /> 50 to 10,000 cubic yards <br /> first 1,000 cubic yards $194.50 <br /> each additional 1,000 cubic yards or fraction thereof 75% of Grading Permit $14.50 <br /> 10,001 cubic yards or more Fee, <br /> first 10,000 cubic yards 1-hour min. $325.00 <br /> each additional 1,000 cubic yards or fraction thereof $10.00 <br /> F. Other Fees <br /> ADMINISTRATIVE CHARGE FOR MISCELLANEOUS REQUESTS: Time& Material <br /> Administrative costs associated with items not otherwise specified, reports and Basis, <br /> requests not covered by permit or plan review fees. $20 Minimum <br /> MISCELLANEOUS BUILDING Inspections outside normal business hours 2-hr minimum <br /> INSPECTIONS** Reinspection .mnimum <br /> Inspections for which no fee is specifically indicated <br /> 2-hr minimum <br /> Housing Inspections, requested by home owner 1-hr minimum <br /> Temp Occupancy Inspection (up to 30 days max) 4-hr minimum <br /> **AII Hourly Inspection Rates are based on fully burdened building inspector rate or <br /> consultant cost,whichever is greater. <br /> WASTE MANAGEMENT PLAN FEE <br /> Nonrefundable fee to administer and implement the WMP review and verification on <br /> covered projects not otherwise subject to California Green Building Standards. $150.00 <br /> ALTERNATE MEANS& METHODS REQUEST FEE Time&Material <br /> Plan review requests for alternate means and methods 1-hr min <br /> INVESTIGATION FEE <br /> Applicable to any work commenced on a building, structure, electrical, gas, mechanical <br /> or plumbing system before obtaining the necessary permits and approvals, in addition 100% of Building <br /> to the required permit fees. Permit Fee <br /> TECHNOLOGY FEE <br /> 3/18/2015 IV. Building: 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.