Laserfiche WebLink
1111111 MILLER <br /> P& ASSOCEZZONI <br /> IATES, INC. <br /> 11111111111 CONSULTING ELECTRICAL ENGINEERS <br /> December 2,2014(Revised December 8,2014) <br /> Mr.Bill Harris <br /> Harris Design <br /> 755 Folger Avenue <br /> Berkeley,CA 94710 <br /> Project: Bernal Park Phase 2—Additional Services—Construction Administration <br /> Dear Mr.Harris: <br /> Thank you for the opportunity to provide this proposal. The scope of proposed services is as follows: <br /> Provide engineering services for construction administrative services for the Banal Phase 2 project: <br /> Construction Administration <br /> Provide construction activities support related to: <br /> 1. Bidding period. <br /> 2. Submittal review and approval. <br /> 3. RFI/RFC responses. <br /> 4. Creation and review of change order proposals. <br /> 5. Assist Inspector by examining construction at various milestones.(3 visits assumed) <br /> All work to be performed in accordance to the original Agreement. Our fee to complete the above scope on a time and <br /> material basis will not exceed$5,200. <br /> The above fees are based upon our Standard Fee Schedule attached. Should this proposal meet with your approval,please <br /> forward a work authorization or sign below and return. Thank you for the opportunity to be of service to you. <br /> Sincerely, <br /> Kevin L.Pezzoni,P.E. <br /> Vice-President <br /> Miller-Pezzoni&Associates,Inc. <br /> KLP jb F:1081171 Banal Park Phase 2\Does\ProposallBemal Park Ph 2 Add Saviva Revised 2014.12.OS.dacz <br /> Approved: Harris Design <br /> By: Date: <br /> Print Name: <br /> MODESTO SAN FRANCISCO <br /> 909 15th Street Suite 7 795 Folsom Street, 1st Floor <br /> Modesto,CA 95354 San Framiam,CA 94107 <br /> (209)575-0312 www.mpa-ee.ctm (415)652-6592 <br />