My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:00 PM
Creation date
4/1/2015 3:32:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bull stocky/ell alien ,_ <br /> ARCHITECTURE•PLANNING•INTERIORS �_\ <br /> Serna% -a c, r*' t'a. ees-B • • a ass ► 27,2016 <br /> Se y to ,., •lied ho <br /> Basic Services <br /> Bid.Phase CA Phase Total tenses <br /> Architectural $6,800 $19,800 $26,400 $1,000 <br /> Consultants CD CD Total <br /> WA $0 <br /> Total Cnslts $0 s0 $0 $0 <br /> Total Basic Services $6,800 $19,8001 $26,400 <br /> Reimbursable nsee $100 $900 $1,000 <br /> 'Total Reimbursable Expenses $1,000 <br /> Additional Services(estimated) <br /> Additional"or equar submission or additional bidder reviews(per) $1,200 <br /> Additional Site Visits(per) $1,200 <br /> Additional Substitution Request evaluations(par) $800 <br /> Additional Deferred Design Submittal reviews $1,800 <br /> Additional Reviews and Punch Lists $1,600 <br /> Assumptions <br /> Bid phase includes Review of Apparent Low Bidder <br /> Bid Phase includes Responses to Bid Questions <br /> Bid Phase Includes up to three(3)"or equal"submission or additional bidder reviews <br /> Construction Phase includes Pre-Construction Meeting and up to two(2)Site Visits <br /> Construction Phase includes up to three(3)Substitution Request evaluations <br /> Construction Phase includes up to two(2)Deferred Design Submittal reviews <br /> Construction Phase Includes reviews of RFI's,Submittals and COR's <br /> Construction Phase Includes one Final Review and Punch List <br /> Courtesy Warranty Walk-through Included 1 month prior to expiration of Contractor Warranty <br />
The URL can be used to link to this page
Your browser does not support the video tag.