My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
031715
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:42:40 PM
Creation date
3/11/2015 11:51:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/17/2015
DESTRUCT DATE
15Y
DOCUMENT NO
4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Construction Requirements <br /> The project shall comply with the "Construction General Permit" requirements of the NPDES <br /> Permit for construction activities (including other land disturbing activities) that disturb one acre <br /> or more (including smaller sites that are part of a larger common plan of development). <br /> Information related to the Construction General Permit is on line at: <br /> • http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.shtml <br /> • http://www.waterboards.ca.gov/water_issues/programs/stormwater/docs/finalconstper <br /> mit.pdf <br /> 1. The Construction General Permit's requirements include, but are not limited to, the <br /> following: <br /> a. The project developer shall obtain a construction general permit (NOI) from the <br /> Regional Water Quality Control Board to discharge stormwater, and to develop and <br /> implement stormwater pollution prevention plans. <br /> b. The project developer shall submit a Stormwater Pollution Prevention Plan (SWPPP) <br /> to the City Engineer/Chief Building Official for review and approval prior to the <br /> issuance of a grading or building permit, whichever is sooner. A copy of the <br /> approved SWPPP, including all approved amendments, shall be available at the <br /> project site for City review until all engineering and building work is complete and <br /> City permits have been finaled. A site specific SWPPP must be combined with <br /> proper and timely installation of the BMPs, thorough and frequent inspections, <br /> maintenance, and documentations. SWPPP for projects shall be kept up to date with <br /> the projects' progress. Failure to comply with the most updated construction SWPPP <br /> may result in the issuance of correction notices, citations, and/or stop work orders. <br /> c. The project developer is responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable measures, <br /> shall be included in the SWPPP and implemented as approved by the City. <br /> i. The project developer shall include erosion control/stormwater quality measures <br /> on the project grading plan which shall specifically address measures to prevent <br /> soil, dirt, and debris from entering the public storm drain system. Such measures <br /> may include, but are not limited to, hydroseeding, hay bales, sandbags, and <br /> siltation fences and shall be subject to the review and approval of the City <br /> Engineer/Chief Building Official. If no grading plan is required, necessary erosion <br /> control/stormwater quality measures shall be shown on the site plan submitted <br /> for a building permit, and shall be subject to the review and approval of the <br /> Building and Safety Division. The project developer is responsible for ensuring <br /> that the contractor is aware of and implements such measures. <br /> ii. All cut and fill slopes shall be revegetated and stabilized after completion of <br /> grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary irrigation <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.