My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
030315
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:37:04 PM
Creation date
2/24/2015 3:52:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/3/2015
DESTRUCT DATE
15Y
DOCUMENT NO
8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FDR 5.Cost Proposal <br /> City of Pleasanton I Water and Wastewater Rate Study <br /> The fee estimate shown in Table 5-1 assumes HDR is selected to complete both studies <br /> simultaneously, thus resulting in efficiencies and costs savings as a result of combining project <br /> meetings for the water and wastewater rate studies, combined customer education and <br /> outreach, and the project kick-off meeting. <br /> To complete both the water and wastewater rate studies, HDR would propose a combined fee <br /> estimate of $83,595, which includes a wastewater labor estimate of $31,530, a water labor <br /> estimate of$44,910, and combined expenses of$7,155. <br /> Should HDR be selected for a single study (water or wastewater), HDR will work the City to <br /> develop a final proposed scope and fee for the selected study. <br /> Should the City request additional services under this contract, the services will be provided at <br /> the current hourly billing rates. Portions of this price proposal can be expanded or reduced in <br /> conformance with scope adjustments and as mutually agreed upon in writing by the City and <br /> HDR. <br /> 4-2 15007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.