My WebLink
|
Help
|
About
|
Sign Out
ORD 2108
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
12/16/2014 11:55:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
12/2/2014
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2108
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prior to the issuance of a building permit; and 2) prior to final inspection. The <br /> verification shall be provided to the Planning Division. <br /> 21.The State of California's Green Building Standards Code, "CALGreen", as <br /> amended, shall apply to the project, as applicable. <br /> Building <br /> 22.The building(s) covered by this approval shall be designed and constructed to the <br /> Title 24 Building Standards, including Building, Electrical, Mechanical, Plumbing, <br /> Energy, Fire, Green Building and both State and Federal accessibility <br /> requirements in effect and as amended by the City of Pleasanton at the time of <br /> Building Permit submittal. <br /> 23.AII Building and Fire permit plans, including demolition, on-site, building shell and <br /> tenant improvements shall be submitted to the Building and Safety Division for <br /> review and approval. <br /> Traffic Engineering <br /> 24.The applicant or responsible party shall pay any traffic impact fees for the subject <br /> use as determined by the City Traffic Engineer. This includes both the <br /> Pleasanton Traffic Impact Fee and the Tri-Valley Transportation Fee. These fees <br /> shall be paid prior to issuance of a building permit. <br /> 25.AII new parking spaces shall conform to the City standard parking dimensions. <br /> Plans submitted to the Building Division for permits shall have the dimensions <br /> clearly noted on the plans. <br /> 26.The developer shall submit a comprehensive traffic control plan prior to issuance <br /> of a Building Permit for review by the City Traffic Engineer. The plan shall <br /> include scheduling of major truck trips and deliveries, to avoid peak travel hours, <br /> lane closure procedures such as flagger stations, signage, cones, and other <br /> warning devices that will be implemented during construction. <br /> Engineering <br /> 27.All utility lines shall be installed in conduit. Only PG&E switch enclosures or <br /> capacity banks can be installed above ground provided the units are screened <br /> with landscaping to the satisfaction of the Director of Community Development. <br /> Building <br /> 28.In accordance with the Fats, Oils and Grease (FOG) Program, all sinks and wash <br /> basins in the convenience store (excluding those located inside the restrooms) <br /> shall be plumbed to a grease trap. The grease trap(s) shall be installed in an <br /> PUD-102 3192 Santa Rita Road <br /> Conditions of Approval Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.