Laserfiche WebLink
The Center provides supplementary academic programming for students grades K-6, and individual <br /> tutoring for students grades 7-10 (as requested). While the Center's focus is academic and cultural <br /> supplementation to day school programs,the purpose of this application is to recognize the needs of the <br /> `whole child,' by also providing appropriate opportunities for exercise and recreation. To this end,we <br /> propose to construct a playground,near the Center,which includes a play structure and some grassy area <br /> to permit periods of play outdoors. <br /> Phase I: Demolition <br /> It will be necessary to demo curbing around 8 existing parking spaces,remove asphalt from the spaces(to <br /> permit drainage),remove shrubs adjacent to the existing building,and to level the area. <br /> Phase II: Reconstruction/installation: <br /> An appropriate curb will be installed at the outer edge of the existing parking spaces,and the demolished <br /> parking spaces will be filled to the level of the existing lawn area. Shrubs now in place along the building <br /> will be removed. A synthetic play surface of appropriate size will be installed under the location of the <br /> play structure. The balance of the enclosed space will be planted/replanted to a sturdy lawn grass meeting <br /> drought-tolerant standards,tying into existing sprinkler system and drainage. <br /> N.B.: The existing water supply for the building sprinkler system(a tall pipe with gauges and valves <br /> located at building wall)will be caged to an appropriate level(for gauges and valves),and lockable access <br /> doors provided. <br /> A play structure of appropriate size and features,and two benches will be installed. Appropriate <br /> accessibility accommodations will be considered and addressed. The whole area will be fenced with <br /> appropriate steel fencing,and two gates, furnished with fire-safe escape hardware(one on the street-side <br /> which will be used in an emergency,and one near the front walkway which provides easy access to the <br /> Center),will be installed. Appropriate landings and tie-ins to walkways will be constructed. <br /> Phase III. Usage and Schedule <br /> The Center will continue in operation per existing permits,i.e.,there will be no change to the Center <br /> program as a result of this proposal. When established,the playground will be used on school clay <br /> afternoons(2-6 p.m.)to provide outdoor exercise and fresh air for K-4th(and occasionally 5th and 6'h- <br /> grade) students of the Center. Students wil be supervised both in walking to and from the playground, <br /> and when they are within the fenced area. No more than 16 students will occupy the playground at a <br /> time. <br /> Parking <br /> The Center picks up students from their respective schools and brings them to the Center, so that parents <br /> do not ordinarily come to the Center during the day. Parents do come to the Center in the evening to pick <br /> up their children,but normally do not remain parked for more than a few minutes,so that the Center's <br /> allowance for parking spaces is not generally heavily utilized. <br /> We are aware that,strictly on the issue of allotment of parking spaces,our request to reduce available <br /> parking by 8 spaces is an issue. However,the rear of the shopping center has more than 140 spaces. On <br />