Laserfiche WebLink
CITY OF PLEASANTON <br /> DEVELOPMENT IMPACT AND CONNECTION FEES <br /> E. Tri-Valley Transportation Development Fee (due at the time building permit is issued) <br /> - Fee collected for Tri-Valley Development Council to fund traffic mitigation improvements in the Tri-Valley Development Area <br /> - Subject to an annual inflation adjustment(by the TVTC)on March 1 of each year based upon the Engineering News Record Construction Cost Index for <br /> the San Francisco Bay Area <br /> Residential Single-family detached $2,433.00 <br /> (per dwelling unit) Single-family attached(Townhouse) $2,433.00 <br /> Multi-family(Apartment,Condominium) $1,549.00 <br /> Second Unit(In-law,Aupair,etc.) $665.00 <br /> Affordable Housing $0.00 <br /> Non-residential Office, per square foot of gross floor area $4.37 <br /> Retail,per square foot of gross floor area $1.62 <br /> Industrial,per square foot of gross floor area $2.95 <br /> Other Uses,per average am/pm peak hour trip $2,433.00 <br /> F. Downtown Revitalization District Parking In-Lieu Fee <br /> - When development within the Downtown Revitalization District is not able to accommodate all of its required parking onsite the following fee will be <br /> collected by the City to purchase land for and to construct public parking lots. <br /> - This fee subject to annual inflation adjustment on Apri/1 of any year in which the fee has not been recalculated,based on the annual change in <br /> EnoinervinoNews Record Construction Cost Index <br /> per parking space I $18,644.04 <br /> G. Water Connection Fees -City <br /> For each single family house, or any other use that is determined by the City Engineer or the Engineer's duly appointed <br /> representative to have a water demand equivalent to that of a single-family house, for normal domestic-type water uses only, <br /> there shall be a connection fee charged for each service connection as indicated in the following table. This shall be the minimum <br /> charge for all uses. For all other uses, for each service connection, a charge shall be made as established in the following <br /> table depending on the size of the meter required for that service connection as determined by the City Engineer or his duly <br /> appointed representative. <br /> N. Pleasanton All Other Service <br /> Meter Size Improvement Dist 2B Connections <br /> 5/8 inch(displacement type) _ $ 460.00 $ 1,200.00 <br /> 3/4 inch(displacement type) _ $ 690.00 $ 1,800.00 <br /> Amounts at right DO NOT include water meter 1 inch(displacement type) $ 1,150.00 $ 3,000.00 <br /> installation fees,which are revised periodically 1.5 inch(displacement type) _ $ 2,300.00 $ 6,000.00 <br /> based on current costs for labor&materials as 2"(displacement type) _ $ 3,680.00 $ 9,600.00 <br /> authorized in Section B"Water Meter& 2"(OMNI C2) $ 3,680.00 $ 9,600.00 <br /> Installation Fees". 3 inch(OMNI C2) $ 8,050.00 $ 21,000.00 <br /> 4 inch(OMNI C2) $ 23,000.00 $ 60,000.00 <br /> 6 inch(OMNI C2) _ $ 46,000.00 $ 120,000.00 <br /> • 8 inch(OMNI C2) $ 80,500.00 $ 210,000.00 <br /> 10 inch(OMNI C2) $ 126,500.00 $ 330,000.00 <br /> For any service connection larger than listed above, the City Engineer or his duly appointed representative will determine <br /> the charge;or a battery of meters may be used at the City Engineer's option. <br /> Any change in use or addition requiring greater capacity will require the payment of additional fees at the rates established <br /> herein as a condition of continued service. <br /> Page C2 <br />