Laserfiche WebLink
Pedestrians: Sidewalks connecting the hotel, the retail uses, and the fast -food restaurant are in <br />place within the Pleasanton Square II Shopping Center area. The applicant is proposing a <br />walkway to connect the project site to the sidewalk next to the Smart & Final retail store thus <br />completing the pedestrian circulation system within in the shopping center. <br />Trip Generation and Roadway Improvements <br />Programs of the Circulation Element of the General Plan state the following: <br />Program 2.2: Require site - specific traffic studies for all major developments which <br />have the potential to cause the level of service at one or more major intersections to <br />exceed Level of Service (LOS) D, and require developers to implement the <br />mitigation measures identified in these studies. In general, require development to <br />improve congested intersections adjacent to such development or to pay its pro -rata <br />share of the cost of such improvements, and to pay traffic development fees for use <br />in mitigating traffic impacts in other areas of the city. <br />Program 5.1: Gateway intersections are exempted from the citywide LOS D <br />standard (constrained gateway policy) but consideration may be given to <br />improvements at gateway intersections when it is determined that such <br />improvements are necessary and are consistent with maintaining visual character, <br />landscaping, and pedestrian amenities. <br />A project- specific traffic impact analysis, dated November 4, 2013, was prepared by Hexagon <br />Transportation Consultants, for the purpose of identifying the potential traffic impacts of the <br />proposed project. <br />The traffic study analyzed the following traffic scenarios with and without the project traffic: <br />1. Existing conditions - The existing conditions scenario is based on traffic counts <br />conducted from the year 2012 and obtained from the City's Synchro database. <br />2. Existing plus project condition - the existing plus project conditions were estimated <br />by adding to existing traffic volumes the additional traffic generated by the project. <br />This scenario was used to identify short-term project impacts to the transportation <br />system. <br />3. Existing plus approved conditions - The existing plus approved project scenario <br />includes the existing traffic conditions plus traffic from all approved but not yet built <br />projects including the Housing Element update. This scenario does not include the <br />proposed project. <br />4. Buildout conditions - The buildout scenario consists of traffic from approved but not <br />yet built projects plus traffic from development that has not received approval from <br />the City but has been identified to be completed in the long term with the buildout of <br />the 2005 -2025 Pleasanton General Plan and the Housing Element update. The <br />buildout traffic volumes do not include the proposed project. <br />5. Buildout plus project conditions - The buildout with project conditions were estimated <br />by adding the traffic generated by the project to the buildout traffic volumes. The <br />P13- 2533/PUD- 100/PUD- 96- 13 -02M Planning Commission <br />Page 17 of 27 <br />