Laserfiche WebLink
c. During re- patination, collect the rinse water in a tank and <br />dispose off -site or discharge to sewer (with prior authorization <br />from DSRSD) . <br />j. Roof drains shall drain away from the building foundation. Stormwater <br />flow shall drain to a landscaped area or to an unpaved area wherever <br />practicable as determined by the City Engineer /Chief Building Official. <br />k. There shall be no direct roof leaders connected to the street <br />gutter /parking lot or storm drain system, unless otherwise approved by <br />the City engineer. <br />B. Construction Requirements <br />The project shall comply with the "Construction General Permit" requirements <br />of the NPDES Permit for construction activities (including other land <br />disturbing activities) that disturb one acre or more (including smaller sites that <br />are part of a larger common plan of development). <br />Information related to the Construction General Permit is on line at: <br />• http: //www.waterboards.ca.qov /water issues /programs /stormwater /construc <br />tion.shtml <br />• http: / /www.waterboards.ca.gov /water issues /programs /stormwater /docs /fin <br />alconstpermit.pdf <br />1. The Construction General Permit's requirements include, but are not <br />limited to, the following: <br />a. The project developer shall obtain a construction general permit (NOI) <br />from the Regional Water Quality Control Board to discharge <br />stormwater, and to develop and implement stormwater pollution <br />prevention plans. <br />b. The project developer shall submit a Stormwater Pollution Prevention <br />Plan (SWPPP) to the City Engineer /Chief Building Official for review <br />and approval prior to the issuance of a grading or building permit, <br />whichever is sooner. A copy of the approved SWPPP, including all <br />approved amendments, shall be available at the project site for City <br />review until all engineering and building work is complete and City <br />permits have been finaled. A site specific SWPPP must be combined <br />with proper and timely installation of the Best Management Practices <br />(BMPs), thorough and frequent inspections, maintenance, and <br />documentations. SWPPP for projects shall be kept up to date with the <br />projects' progress. Failure to comply with the most updated <br />construction SWPPP may result in the issuance of correction notices, <br />PUD -100 <br />Conditions of Approval (Planning Commission) <br />Chick -fil -A <br />Page 19 <br />