80. The haul route for all materials to and from this development shall be <br />approved by the City Engineer prior to the issuance of a permit, and shall <br />address the need to schedule major truck trips and deliveries during off peak <br />travel times to avoid peak travel congestion. It shall also include a provision <br />to monitor the street surfaces used for the haul route so that any damage and <br />debris attributable to the haul trucks is identified and corrected at the expense <br />of the project developer. <br />81.AII dry utilities (electric power distribution, gas distribution, communication <br />service, cable television, street lights and any required alarm systems) <br />required to serve existing or new development shall be installed underground <br />in conduit and in a joint utility trench unless otherwise specifically approved by <br />the City Engineer. <br />82.Any damage to existing street improvements during construction on the <br />subject property shall be repaired to the satisfaction of the City Engineer at <br />full expense to the project developer. This shall include slurry seal, overlay, <br />landscaping, irrigation, signing, striping and pavement markings or street <br />reconstruction if deemed warranted by the City Engineer. <br />83. This approval does not guarantee the availability of sufficient water and /or <br />sewer capacity to serve the project. <br />84.The project developer and /or the project developer's contractor(s) shall obtain <br />an encroachment permit from the City Engineer prior to moving any <br />construction equipment onto the site. <br />85.The project developer shall include erosion control measures on the final <br />grading plan, subject to the approval of the City Engineer. The project <br />developer is responsible for ensuring that the contractor is aware of such <br />measures. All cut and fill slopes shall be revegetated and stabilized as soon <br />as possible after completion of grading, in no case later than October 15. No <br />grading shall occur between October 15 and April 15 unless approved erosion <br />control measures are in place, subject to the approval of the City Engineer. <br />Such measures shall be maintained until such time as permanent <br />landscaping is in place. <br />86. Storm drainage swales, gutters, inlets, outfalls, and channels not within the <br />area of a dedicated public street or public service easement approved by the <br />City Engineer shall be privately maintained by the property owners or through <br />an association approved by the City. <br />87.AII retaining walls along the street shall be placed behind the Public Service <br />Easement (PSE), unless otherwise approved by the City Engineer. <br />Fire <br />PUD -100 <br />Conditions of Approval (Planning Commission) <br />Chick -fil -A <br />Page 13 <br />