My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
120214
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 11:33:47 AM
Creation date
11/25/2014 10:58:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/2/2014
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. The proposed restaurant shall be constructed to allow for future installation of a <br />Photovoltaic (PV) system. The project applicant/developer shall comply with the <br />following requirements for making the office building photovoltaic- ready: <br />a. Electrical conduit and cable pull strings shall be installed from the roof /attic <br />area to the building's main electrical panels; <br />b. An area shall be provided near the electrical panel for the installation of an <br />"inverter" required to convert the direct current output from the photovoltaic <br />panels to alternating current; and <br />c. Engineer the roof to handle an additional load as determined by a structural <br />engineer to accommodate the additional weight of a prototypical photovoltaic <br />system beyond that anticipated for roofing. <br />These measures shall be shown on the building permit plan set submitted to the <br />Director of Community Development for review and approval before issuance of <br />the building permit. <br />8. Prior to issuance of a building permit, the project developer shall pay the <br />applicable Zone 7 and City connection fees and water meter cost for any water <br />meters, including irrigation meters. Additionally, the project developer shall pay <br />any applicable Dublin -San Ramon Services District (DSRSD) sewer permit fee. <br />9. Appliances meeting Energy Star standards shall be installed as part of the <br />project. The proposed appliances shall be indicated on the plans submitted for <br />the issuance of a building permit. <br />10. Water conservation devices shall be installed as part of the project. The water <br />conservation devices shall be stated on the plans submitted for the issuance of a <br />Building Permit. <br />11. Energy efficient lighting shall be installed within the restaurant. The energy <br />efficient lighting shall be shown on the plans submitted for the issuance of a <br />building permit. <br />12. No temporary signage is approved as part of this application. <br />13.AII exterior lighting including landscape lighting shall be directed downward and <br />designed or shielded so as to not cause glare or shine onto neighboring <br />properties or streets. The project/building developer shall submit a final lighting <br />plan with the plans submitted to the Building and Safety Division for permits, <br />including photometrics and drawings and /or manufacturer's specification sheets <br />showing the intensity, size, design, and types of light fixtures proposed for the <br />exterior of the buildings and, if applicable, for the site. The lighting plan shall be <br />subject to review and approval by the Director of Community Development prior <br />to issuance of building permits for the project. <br />PUD -100 <br />Conditions of Approval (Planning Commission) <br />Chick -fil -A <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.