• Increase in the revenue budget of $24,083 to account for interest and developer <br />contributions received since the adoption of the Midyear Budget on March 18, 2014 <br />• A majority of the increase in the expenditure budget is for City staff time spent <br />on water replacement projects ($81,412) and increases in future CIP projects <br />funded by developer contributions ($24,083). <br />Table 2A - Water CIP Funds Adjusted Budget to Actual Revenues, Transfers & Expenditures <br />Table 2B - Water CIP Funds Recommended Budget Carryovers to 2014/15FY <br />PROJECTED FUND BALANCE, JUNE 30, 2014 <br />$ 15,952,497 <br />Recommended <br />Year -End <br />Pressure Reducing Station Rehabilitation <br />48,801 <br />Recycled Water Project <br />118,634 <br />Amended <br />Budget <br />Adjusted <br />127,483 <br />$ <br />°h <br />Water CIP Funds <br />Budget <br />Amendments <br />Budget <br />Actual <br />Variance <br />Variance <br />Beginning Fund Balance <br />$ 14,651,488 <br />101,930 <br />$ 14,651,488 <br />$ 14,651,488 <br />Bi- Annual Replacement of Polybutylene Service Laterals <br />18,362 <br />Revenues <br />337,750 <br />$ 24,083 <br />361,833 <br />675,472 <br />$ 313,639 <br />86.7% <br />Transfers In /(Out) <br />2,100,000 <br />101,732 <br />2,100,000 <br />2,106,636 <br />6,636 <br />0.3% <br />Expenditures <br />6,114,623 <br />113,862 <br />6,228,485 <br />1,481,099 <br />(4,747,386) <br />-76.2% <br />Ending Fund Balance <br />$ 10,974,615 <br />$ (89,779) <br />$ 10,884,836 <br />$ 15,952,497 <br />$ 5,067,661 <br />Table 2B - Water CIP Funds Recommended Budget Carryovers to 2014/15FY <br />PROJECTED FUND BALANCE, JUNE 30, 2014 <br />$ 15,952,497 <br />PROJECT CARRYOVERS: <br />Pressure Reducing Station Rehabilitation <br />48,801 <br />Recycled Water Project <br />118,634 <br />Advanced Metering Infrastructure <br />3,000,000 <br />Annual Water Pump and Motor Repairs <br />127,483 <br />Water Connection Fee Update <br />25,000 <br />Backflow Administration <br />50,000 <br />Water Rate Analysis <br />60,000 <br />Water Telemetry Upgrades <br />50,000 <br />Bi- Annual Water Quality Improvement Project <br />44,602 <br />Bi- Annual Electrical Panel Upgrades and Restorations <br />101,930 <br />Bi- Annual Control Valve Installation <br />55,942 <br />Bi- Annual Replacement of Polybutylene Service Laterals <br />18,362 <br />Bi- Annual Overhaul of Emergency Water Generators <br />22,053 <br />Bi- Annual Water Tank Corrosion Repairs <br />100,000 <br />Annual Replacement of Water Meters <br />237,023 <br />Del Valle Parkway Water Main Extension <br />585,824 <br />Future Designated CIP Projects* <br />101,732 <br />TOTAL PROJECT CARRYOVERS <br />$ 4,747,386 <br />ADJUSTED FUND BALANCE, JUNE 30, 2014 <br />$ 11,205,111 <br />Per Developer Contributions worksheet maintained by the Finance Department <br />Miscellaneous CIP Funds <br />Table 3A summarizes the 2013/14FY activity for the Miscellaneous CIP Funds. Actual <br />revenues and transfers were less than adjusted budget by $1,106,779 and $97,763, <br />respectively. The revenue variance is due to the ongoing LED Street Light Retrofit <br />project that is being funded through a loan from the California Energy Resources <br />Conservation and Development Commission. Revenues from the loan were less than <br />projected because funds are not received until after the project is completed. The <br />project is expected to be completed in the 2014/15FY; therefore, these revenues are <br />recommended to be carried forward to 2014/15FY. Actual expenditures were less than <br />Page 4 of 10 <br />