My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
111814
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 11:27:30 AM
Creation date
11/13/2014 3:14:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/18/2014
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br /> MAINTENANCE AGREEMENT FOR STORM DRAIN <br /> This MAINTENANCE AGREEMENT (hereinafter"Agreement"), is made and entered into this <br /> _day of , 2014,by and between Zone 7 of Alameda County Flood Control and Water <br /> Conservation District, a body corporate and politic (hereinafter"Zone 7") and the City of <br /> Pleasanton, a Municipal Corporation(hereinafter"City"). <br /> RECITALS <br /> A. Ponderosa Homes is building a housing development which includes a public trail to be operated <br /> by the City under a license agreement with Zone 7. The trail includes installation of a storm <br /> drain for conveying storm water captured from the trail area and Zone 7's maintenance road area <br /> along the southern portion of Lake Ito an existing City storm drain system as shown on Exhibit <br /> A, attached hereto and made a part hereof <br /> B. The storm drain crosses street right of way, known as Mohr Avenue (10 foot wide) owned by the <br /> City and Zone 7 property, known as Lake I (adjacent to and northerly of said Mohr Avenue) <br /> owned by Zone 7. <br /> C. This Maintenance Agreement shall set forth the obligations of each party with regard to the <br /> Storm Drain System. <br /> NOW, THEREFORE, BE IT MUTUALLY AGREED as follows: <br /> 1. Zone 7 Maintenance Responsibilities: City grants permission to Zone 7 to reconstruct, <br /> replace, use, inspect,maintain, repair, operate or remove the Storm Drain System, <br /> including any and all appurtenances thereto,under, over, and across all that property <br /> known.as Mohr Avenue. <br /> 2. City Maintenance Responsibilities: City has offered and Zone 7 has accepted City's offer <br /> for City to perform routine preventative maintenance on the Storm Drain System on that <br /> property known as Lake I, from the storm drain inlet generally southwest to the Mohr <br /> Avenue right-of-way i.e., routine cleaning of the Storm Drain System to keep it clear <br /> from debris. Zone 7 shall retain all other responsibilities including maintenance and <br /> repairs, e.g., repairing or replacing broken or collapsed pipes, separated joints, etc. <br /> However, in the event that the City's actions damage the Storm Drain System, the City <br /> shall be responsible for repairing the damage. <br /> 3. Term: The term of this Maintenance Agreement shall be for twenty-five(25) years from <br /> the date of execution with an option by Zone 7 to renew for additional periods of twenty- <br /> five(25) years upon written notice to City. The parties' obligations to indemnify(section <br /> 6 Indemnification) shall survive the termination of this Agreement. <br /> 4. Rights to Access: Zone 7 grants the City access over Zone 7 property so that City may <br /> access the Storm Drain System to perform said maintenance and/or repairs. City grants <br /> Zone 7 access over City property so that Zone 7 may access the Storm Drain System to <br /> perform said maintenance and/or repairs. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.