My WebLink
|
Help
|
About
|
Sign Out
ORD 2107
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
10/10/2014 12:36:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/16/2014
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2107
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Compliance with a Diazinon pollutant reduction plan (Pesticide Plan) to <br /> reduce or substitute pesticide use with less toxic alternatives. <br /> c. Compliance with a Copper Pollutant Reduction Plan and a Mercury Pollutant <br /> Reduction Plan. <br /> 2. The following requirements shall be incorporated into the project: <br /> a. The project developer shall submit a final grading and drainage plan, <br /> including stormwater treatment calculations, prepared by a licensed civil <br /> engineer depicting all final grades, onsite drainage control measures, and bio- <br /> retention swales. Irrigated bio-retention swales shall be designed to <br /> maximize stormwater entry at their most upstream point. The grading and <br /> drainage plans shall be subject to the review and approval of the City <br /> Engineer prior to the issuance of a grading or building permit, whichever is <br /> sooner. <br /> b. In addition to natural controls, the project developer may be required to install <br /> a structural control(s), such as an oil/water separator(s), sand filter(s), or <br /> approved equal(s) in the parking lot and/or on the site to intercept and pre- <br /> treat stormwater prior to reaching the storm drain. The design, location(s), <br /> and a schedule for maintaining the separator shall be submitted to the City <br /> Engineer/Chief Building Official for review and approval prior to the issuance <br /> of a grading or building permit, whichever is sooner. The structural control <br /> shall be cleaned at least twice a year (once immediately prior to October 15 <br /> and once in January). <br /> c. The project developer shall submit to the City Engineer the sizing design <br /> criteria and calculations for Trash Capture Devices (TCDs), and for the <br /> treatment of stormwater runoff. The design criteria and calculations shall be <br /> subject to the review and approval of the City Engineer and shall be <br /> submitted prior to the issuance of a grading or building permit, whichever is <br /> sooner. <br /> d. Building/Structures shall be designed to minimize the occurrence and entry of <br /> pests into buildings, thus minimizing the need for pesticides, as determined <br /> by the Chief Building Official prior to the issuance of a building permit. <br /> e. The project's landscape and irrigation plans shall be designed to: 1) minimize <br /> the use of fertilizers and pesticides that can contribute to stormwater pollution; <br /> and 2) promote surface infiltration. Prior to the installation of project <br /> landscaping and irrigation, the project landscape architect shall submit a <br /> landscaping and irrigation plan to the City Engineer for review and approval <br /> and submit written verification stating the project incorporates the following: <br /> i. Plants tolerant of saturated soil conditions and prolonged exposure to <br /> water in areas that provide detention of water. <br /> PUD-106, Chrylser-Jeep-Dodge Page 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.