Laserfiche WebLink
and ensure that all construction workers are aware of the location of the line. <br /> The location of the pipeline shall be noted on the site and construction plans. <br /> Further, the project contractor shall take all appropriate measures necessary to <br /> ensure that the line is not disturbed. <br /> 83. In accordance with measure HZ-2.1, the project developer shall develop an <br /> emergency response plan prior to construction that will include response <br /> measures in the event that there is disturbance of any underground utilities. <br /> The plan will be subject to review and approval by the Building and Safety <br /> Division and/or City Engineer. <br /> 84. In accordance with measure HY-1.1, and in accordance with the applicable <br /> provisions of the Municipal Regional Permit (MRP)-NPDES Permit, <br /> implementation of and compliance with the stormwater quality BMPs are <br /> required. However, to ensure that implemented BMPs are effective for <br /> reducing potential pollutant loads to a sufficient level of protection, each project <br /> developer shall prepare and implement a site-specific Water Quality <br /> Management Plan (WQMP) with BMPs targeted to reduce post-construction <br /> pollutants listed in Table 3.5-5 of the EIR. <br /> This WQMP shall identify specific stormwater BMPs for reducing <br /> potential pollutants in stormwater runoff. BMPs shall be selected to target <br /> pollutants listed in Table 3.5-5 of the EIR; selection criteria and <br /> documentation shall be incorporated into the WQMP. A qualified engineer <br /> shall prepare and submit, concurrently with the submittal of off-site or on-site <br /> improvement plans, (whichever comes first), the WQMP for review and approval <br /> by the City Engineer. The WQMP must be approved by a qualified engineer of <br /> the City's Engineering Division prior to the beginning of construction activities. <br /> The WQMP shall include the following BMPs along with selected BMPs to target <br /> pollutant removal: <br /> a. Waste and materials storage and management BMPs (design <br /> and construction of outdoor materials storage areas and trash and <br /> waste storage areas, if any, to reduce pollutant introduction). <br /> b. Spill prevention and control BMPs. <br /> c. Slope protection BMPs. <br /> d. Water efficient irrigation practices. <br /> e. Permanent erosion and sediment controls (e.g., hydroseeding, <br /> mulching, surface covers). <br /> Projects within the Project Area will be required to comply with the applicable <br /> provisions C3.c of MRP, including Low Impact Development (LID) source control, <br /> site design, and stormwater treatment if applicable. <br /> The WQMP shall not include infiltration BMPs unless they comply with design <br /> guidelines and requirements specified in TC-1: Infiltration Basins in the CASQA <br /> PUD-106, Chrylser-Jeep-Dodge Page 15 <br />