Laserfiche WebLink
j. <br />ii. Block all storm drain inlets downstream of the wash. <br />iii. collect in a tank and dispose off -site, or discharge the wash <br />water to the sanitary sewer (with prior authorization from <br />DSRSD). <br />c. During re- patination, collect the rinse water in a tank and dispose off - <br />site or discharge to sewer (with prior authorization from DSRSD) . <br />Roof drains shall drain away from the building foundation. Stormwater flow <br />shall drain to a landscaped area or to an unpaved area wherever practicable <br />as determined by the City Engineer /Chief Building Official. <br />k. There shall be no direct roof leaders connected to the street gutter /parking lot <br />or storm drain system, unless otherwise approved by the City engineer. <br />B. Construction Requirements <br />The project shall comply with the "Construction General Permit" requirements of the <br />NPDES Permit for construction activities (including other land disturbing activities) that <br />disturb one acre or more (including smaller sites that are part of a larger common plan <br />of development). <br />Information related to the Construction General Permit is on line at: <br />• http: / /www.waterboards.ca.gov /water issues / proqrams /stormwater /construction.shtml <br />• http://www.waterboards.ca.qov/water issues /programs/ stormwater /docs /finalconstpermit.pdf <br />1. The Construction General Permit's requirements include, but are not limited to, <br />the following: <br />a. The project developer shall obtain a construction general permit (NOI) from <br />the Regional Water Quality Control Board to discharge stormwater, and to <br />develop and implement stormwater pollution prevention plans. <br />b. The project developer shall submit a Stormwater Pollution Prevention Plan <br />(SWPPP) to the City Engineer /Chief Building Official for review and approval <br />prior to the issuance of a grading or building permit, whichever is sooner. A <br />copy of the approved SWPPP, including all approved amendments, shall be <br />available at the project site for City review until all engineering and building <br />work is complete and City permits have been finaled. A site specific SWPPP <br />must be combined with proper and timely installation of the BMPs, thorough <br />and frequent inspections, maintenance, and documentations. SWPPP for <br />projects shall be kept up to date with the projects' progress. Failure to comply <br />with the most updated construction SWPPP may result in the issuance of <br />correction notices, citations, and/ or stop work orders. <br />PUD -106, Chrylser- Jeep -Dodge Page 36 <br />