Laserfiche WebLink
excavate the site, evaluate the site for historical references, <br />recover artifacts as appropriate, and cover the site to preserve <br />remaining artifacts. The project developer shall maintain <br />sufficient buffering between development subsurface construction <br />and the location of resources. <br />iii. Excavation /Removal: The archaeological consultant shall excavate <br />and recover the cultural resources as described above and remove <br />artifacts as necessary. However, due to the depth of development <br />excavation, the site would be permanently disturbed. <br />If the City requires data recovery, the archaeological consultant shall first <br />prepare an Archaeological Data Recovery Plan that s /he shall submit to the <br />Director of Community Development for review and approval. <br />If development plans call for trenching within 200 feet of the Arroyo Mocho, a <br />program of subsurface mechanical trenching along the impacted route <br />shall precede project trenching in an attempt to locate additional <br />archaeological sites and /or the original meander of the Mocho, where such <br />sites would most likely be. If additional sites were to be found, the project <br />developer shall adhere to the above mitigation measures. <br />If human remains are discovered, the project developer shall contact the <br />County Coroner immediately. If the coroner determines that the human <br />remains are Native American remains, the project developer shall notify the <br />California State Native American Heritage Commission. <br />The archaeological consultant shall prepare a Final Archaeological Resources <br />Report, meeting City and state standards, evaluating the historical importance <br />of the archaeological resource and describing the archaeological and <br />historical research methods employed in the testing, monitoring, and <br />data recovery programs. The Director of Community Development shall <br />review and approve this document. The project developer shall file the report <br />with appropriate state offices. <br />96. In accordance with measure UT -1, plans submitted to the Building and Safety <br />Division for plan check shall incorporate low -flow irrigation head and /or drip <br />irrigation with electric controllers set to water after 7:00 p.m. and before 10:00 <br />a.m., and property soil preparation for landscaped areas that includes a minimum <br />of two inches of mulch and two inches of organic soil amendment, as <br />recommended by a qualified landscape architect. <br />97. If it is determined through field inspections and /or monitoring that a site is not in <br />compliance with an EIR mitigation /improvement measure, the responsible party <br />for implementation of the mitigation /improvement measure is the responsible <br />party to bring the mitigation /improvement measure into compliance. The <br />responsible party is listed in the EIR Mitigation Monitoring and Reporting Plan. <br />PUD -106, Chrylser- Jeep -Dodge Page 20 <br />