Laserfiche WebLink
79. In accordance with measure AQ -3.1, the applicant shall employ measures as <br />described within Operational Air Emissions Plan included as Exhibit B. <br />80. In accordance with measure BIO -5.1, prior to the beginning of tree removal or <br />mass grading, between February 15 and August 15, including grading for major <br />infrastructure improvements, an avian nesting survey shall be conducted of all <br />habitat within 350 feet of any grading or earthmoving activity. The survey shall <br />be conducted by a qualified biologist, as determined by the City, and occur no <br />more than 21 days prior to disturbance. If no active nests are found, no further <br />action is required. <br />If active nests for special status avian species or raptor nests are found within <br />the construction footprint, construction activities shall be delayed within a <br />minimum 500 -foot buffer zone surrounding active raptor nests and a minimum <br />250 -foot buffer zone surrounding nests of other special status avian species until <br />the young have fledged. This buffer zone shall not extend beyond the Staples <br />Ranch site. The appropriate buffer can be modified by the City in consultation <br />with qualified biologists and the California Department of Fish and Wildlife <br />(CDFW). No action other than avoidance shall be taken without CDFG <br />consultation. Completion of the nesting cycle shall be determined by a qualified <br />omithologist or biologist, as determined by the City. <br />The buffer zone shall be delineated by highly visible temporary construction <br />fencing, and no intensive disturbance (e.g., heavy equipment operation <br />associated with construction, use of cranes or draglines, new rock crushing <br />activities) or other project related activities that could cause nest abandonment <br />or forced fledging, shall be initiated within the established buffer zone of an <br />active nest. <br />If the project is built in phases, this condition of approval shall be implemented <br />for each phase of development. <br />81. In accordance with measure HZ -2.1, prior to initiation of any on -site <br />construction activities, the project developer shall contact the Underground <br />Service Alert (USA) whose purpose is to receive planned excavation reports <br />from public and private excavators and to transmit those planned excavation <br />reports to all participating excavation. The USA will contact local utilities and <br />inform them that construction is about to begin in their service area. This notice <br />allows local utilities to mark the areas where their underground facilities are <br />located near the construction site so that they may be avoided during project <br />construction. <br />82. In accordance with measure HZ -2.1, prior to construction activities within 50 feet <br />of the PG &E gas line, the project contractor shall identify and demarcate the <br />location of the natural gas pipeline using highly visible markers that will <br />PUD -106, Chrylser- Jeep -Dodge Page 14 <br />