My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
091614
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 12:13:33 PM
Creation date
9/10/2014 12:10:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/16/2014
DESTRUCT DATE
15Y
DOCUMENT NO
03
DOCUMENT NAME
03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br /> ORD 2036 <br /> EXHIBIT A-2 <br /> CONDITIONS OF APPROVAL <br /> PUD-81-30-86D and P11-08561 Site 2,BRE Properties <br /> Mixed Use Development Project <br /> April 17, 2012 <br /> PROJECT SPECIFIC CONDITIONS <br /> Planning Division <br /> t Revised plans related to the depth of live/work spaces, dated "Received, March 27, 2012: on file <br /> with the Planning Division, shall be further revised to reflect a liveMrork depth of 38-feet for <br /> "Garden Building 4." The setback for"Garden Building 4" shall be a minimum of 30-feet from the <br /> curb on Gibraltar Drive. The applicant shall submit elevations and exhibits to the satisfactory of <br /> the Director of Community Development demonstrating how the extended first floor spaces <br /> integrate with overall architectural design. These revisions shall be subject to the review and <br /> approval of the Director of Community Development prior to building permit issuance. <br /> 2. The subject property is zoned Planned Unit Development — Mixed Use (PUD-MU) District. The <br /> permitted and conditionally permitted uses on the subject property shall be those listed on page 13 <br /> of the Hacienda TOO Standards and Design Guidelines. <br /> 3. The development plan (Case No. PUD-81-30-86D) and the Phase I and Phase II Development <br /> Agreement Amendments (Case No. P11-0856) shall expire five years from the effective date of <br /> this ordinance unless a building permit is issued and construction has commenced and is diligently <br /> pursued. <br /> 4. At the time a building permit is issued, the development approved with this PUD development plan <br /> will replace the assigned Hacienda office and commercial square-footage capacity for this site. <br /> 5. The applicant and/or developer shall submit a pad elevation certification prepared by a licensed <br /> land surveyor or registered civil engineer to the Chief Building Official and Director of Community <br /> Development certifying that the pad elevations and building locations (setbacks) are pursuant to <br /> the approved plans, prior to receiving a foundation inspection for the structures. <br /> 6. The applicantproject developer shall work with the Planning Division to increase the amount of <br /> building caps visible from the Interior of the project. <br /> 7. The final design of the patio walls and balcony materials shall be subject to the review and <br /> approval of the Planning Division prior to building permit issuance. <br /> 8. The applicant shall construct 8-foot of paved area and 2-foot of landscaping for the proposed trail <br /> along the northwest and east sides of Site 2. These improvements shall be shown on the plans <br /> submitted to the Building and Safety Division for plan check and permit issuance. The design of <br /> the trail improvements shall be subject to the review and approval of the Director of Community <br /> Development prior to building permit issuance. <br /> 9. The plan shall be revised to reflect internal residential pedestrian access to the trail for Site 2. This <br /> revision shall be subject to the review and approval of the Director of Community Development <br /> and shall be incorporated into the plans submitted to the Building and Safety Division for permit <br /> issuance. <br /> 10. This approval does not guarantee the availability of sufficient water capacity to serve the project. <br /> Prior to the recordation of a Final Map, issuance of a grading permit, issuance of a building permit, <br /> or utility extension approval to the site, whichever is sooner, the applicant shall submit written <br />
The URL can be used to link to this page
Your browser does not support the video tag.