My WebLink
|
Help
|
About
|
Sign Out
21
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
081914
>
21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:39:43 PM
Creation date
8/12/2014 2:29:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2014
DESTRUCT DATE
15Y
DOCUMENT NO
21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. The property owners' association for this development shall be <br /> responsible for maintaining the bio-swales adjoining the public street, the <br /> bio-retention to be located in the public area adjoining Old Foothill Road, <br /> and any other stormwater treatment measures determined to be required <br /> by the City Engineer. The association shall be composed of Lots 1 <br /> through 8. These maintenance responsibilities shall include implementing <br /> the maintenance plan, which is attached to the Stormwater Treatment <br /> Measures Inspection and Maintenance Agreement. This document shall <br /> be reviewed by the City Attorney's Office and recorded with the final map. <br /> b. All storm drain inlets shall be clearly marked and maintained with the <br /> words "No Dumping—Drains to Bay." <br /> c. Ensure wastewater from vehicle and equipment washing operations is not <br /> discharged to the storm drain system. <br /> d. The CC&Rs covering Lots 1 through 8 shall include the statement, "No <br /> person shall dispose of, nor permit the disposal, directly or indirectly, of <br /> vehicle fluids, hazardous materials or rinsewater from cleaning tools, <br /> equipment or parts into the private, on-site storm drains. <br /> e. The CC&Rs covering Lots 1 through 8 shall include the statement, "All <br /> private on-site storm drains shall be cleaned by the property owner at <br /> least twice a year with one cleaning immediately prior to the rainy season." <br /> f. The vegetated bio-retention swales shall be mowed and clippings <br /> removed on a regular basis by the Property Owners Association. <br /> (end) <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.