ELECTRICAL PERMIT FEE WORKSHEET
<br /> ITEM UNIT PRICE •
<br /> Electrical Permit Issuance Fee $23.50
<br /> New Single-Family Dwelling Electrical Permit Fee $0.056 per square foot
<br /> New Multi-Family Electrical Permit Fee $0.050 per square foot
<br /> Electrical Plan Review Fee 25% of Electrical Permit fee, minimum one-hour,
<br /> $130.00
<br /> Additional Plan Review (more than one initial recheck, Minimum one-hour, $130.00, or based upon review
<br /> or for revisions to previously approved plans) time multiplied by the current reviewer rate, plus a
<br /> $20.00 admin fee
<br /> Appliances $4.75 each
<br /> Busways $7.25 per 100 lineal feet
<br /> General Circuits $5.25 per circuit
<br /> Generators (under 10 kVA) $23.50 each
<br /> Lighting Fixtures
<br /> First 20 fixtures $1.10 each
<br /> Fixtures exceeding 20 $0.73 each
<br /> Miscellaneous Electrical Apparatus $18.20 each
<br /> Motors or Generators
<br /> Up to 1 HP (5 1 kVA) $4.75 each
<br /> Up to 10 HP (5 10 kVA) $12.30 each
<br /> Up to 50 HP (5 50 kVA) $24.60 each
<br /> Up to 100 HP (5 100 kVA) $49.50 each
<br /> Over 100 HP (> 100 kVA) $74.50 each
<br /> Photo-Voltaic Systems, Residential
<br /> Up to 15kW $150.00, plus one-hour plan review fee
<br /> Over 15kW $370.00, plus $15 per additional kW above 15, and II
<br /> one-hour plan review fee
<br /> Photo-Voltaic Systems, Non-Residential
<br /> Up to 50kW $240 min, $16 per kW, plus two-hour plan review fee
<br /> Over 50kW $12 per kW, plus $5 per additional kW above 50, and
<br /> four-hour plan review fee
<br /> Receptacles, Switches, Other Outlets
<br /> First 20 outlets $1.10 each
<br /> Outlets exceeding 20 $0.73 each
<br /> Electrical panels
<br /> Up to 199 amp (under 600 volts) $30.50 each
<br /> Up to 999 amp (under 600 volts) $62.15 each
<br /> 1000 amp or more (under 600 volts) $124.30 each
<br /> All panelboards over 600 volts $124.30 each
<br /> Signs, marquees $24.60 each
<br /> Private Spa or Swimming Pool $49.50 each
<br /> Temporary Power(Pole or Pedestal) $23.50 each
<br /> •
<br /> Temporary Power Distribution (for construction sites, $12.30 each
<br /> seasonal lots, etc., per pole or pedestal)
<br /> Transformers $66.50 each
<br />•
<br />•
<br /> REVISED:February 1,2014;January 1,2014;October 31,2013;July 1,2013; March 1,2013;January 1,2013:March 1,2012;January 1,
<br /> 2012;Oct.6,2011;July 1,2011; March 1,2011;January 1,2011; November 15,2010;August 1,2010;July 1,2010;Feb 24,2010;Jan 1,
<br /> •
<br /> 2009;Oct 30,2008;July 1,2008;Jan 1, 2008; Dec. 10,2007;Jan.3,2007;Jan 1,2007;Dec 1,2006;Nov 13,2006;July 14,2006;Jan 3,
<br /> 2006; July 14, 2005; Nov 7, 2004: July 2, 2004; May 10, 2004; March 3, 2003;Jan 31, 3004; April 12, 2002, March 15, 2002, Sept. 6,
<br /> 2001,Jan.5,2001.
<br /> Page 10 of 10
<br /> Fees Handout as of 02-01-14
<br />
|