My WebLink
|
Help
|
About
|
Sign Out
21
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
071514
>
21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:31:56 PM
Creation date
7/9/2014 1:45:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. Foothill Road <br /> The project developer shall: <br /> • Construct the new street tie-in to Foothill Road as shown on the plans <br /> (except as modified above). <br /> • Re-stripe the median striping to create a left turn pocket into the <br /> development. <br /> • Shorten the existing raised median north of the proposed entrance <br /> street/court as determine by the City Engineer to allow for a smooth <br /> transition while exiting the proposed street/court. <br /> • Construct a de-acceleration lane for vehicles traveling southbound and <br /> turning into the site. The de-acceleration lane can be combined with <br /> the existing bike lane on the street. The City Engineer shall determine <br /> the exact length and width of the de-acceleration lane. <br /> 13. The project developer shall provide individual booster pumps on the domestic <br /> water service to Lots 4, 5 and 6, located above the 400-foot elevation. The <br /> proposed location of these pumps shall be shown on the tentative subdivision <br /> map to the satisfaction of the City Engineer and shall be subject to <br /> review/approval by the Planning Commission. <br /> 14. The project developer shall install the following: <br /> a. A V-ditch located along the south property line of Lots 1 through 5 and <br /> along the north property line of Lots 6 and 7 to intercept any storm water <br /> from the lots and direct the water into the bio-retention area; <br /> b. A "V"-ditch along the west property line of Lots 5 and 6 to intercept storm <br /> water runoff from the open space flowing onto these lots; and, <br /> c. Swales or "V"-ditches between these lots to prevent storm water from the <br /> upper lot flowing onto the lower lot <br /> All storm water from the lots and private street/court shall be directed to the blo- <br /> retention area. The storm drain system outside the public right-of-way shall be <br /> private and maintained by the development's homeowners association (HOA). <br /> The HOA shall provide annual maintenance report to the City prepared by a <br /> California licensed Civil Engineer for the bio-retention area and "V"-ditches. <br /> 15. All roof leaders shall be connected to the storm drain system. This statement <br /> shall be added to the development's design guidelines. <br /> 16. Lot 7 shall be accessed through the shared access driveway over Lot 6. After <br /> the subdivision improvements are completed, the project developer shall <br /> eliminate the driveway access from Lot 7 onto Old Foothill Road. This statement <br /> shall appear on the face of the Tentative Subdivision Map. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.