Laserfiche WebLink
1 <br /> 1 St. Francis Electric Exhibit A <br /> Invitation to Bid on "As Needed Services"—HVAC or Pest Control or Lighting <br /> CONTRACTORS LABOR AND EQUIPMENT RATES STREET.PARKING LOT <br /> AND PATHWAY LIGHTS ONLY <br /> Emerg. <br /> Position Description Regular Overtime Caliout <br /> Lighting Tech $ 50.00 $ 75.00 $ 90.00 _ <br /> Laborer $ 60.00 $ 100.00 $ 120.00 <br /> I � <br /> Street Light Truck $ 25.00 $ 25.00 $ 25.00 <br /> Journey Rate _$ 97.00 $ 130.00 $ 170.00 <br /> Apprentice Rate $ 70.00 $ 105.00 $ 135.00 <br /> Other(CRANE TRUCK) $ 45.00 $ 45.00 $ 45.00 <br /> ASSOCIATED COSTS <br /> STREET. PARKING LOT AND PATHWAY LIGHTS ONLY <br /> I. Percent of mark-up on material including overhead and profit: 10% <br /> 2. Percent of mark-up on outside equipment: 10% <br /> (equipment pre-approved by the City). <br /> 3. Install new arm and Luminaire Each $ 860.00 <br /> on PG&E power pole <br /> 4. Night Check per Hour $ 50.00 <br /> 5. Pole Painting Each $ 250.00 <br /> 6. Lamp Disposal Rate Each $ 1.30 <br /> St. Francis Electric!975 Carden Street I San Leandro,CA 94577 1 Off: 510.639-06391 Fax: 510-639-4653 I Page 11 <br />