Laserfiche WebLink
PART B <br /> AN ESTIMATE OF THE COST OF THE MAINTENANCE <br /> 2014-2015 <br /> LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br /> NO. 1993-1 WINDSOR <br /> CITY OF PLEASANTON <br /> A. Landscaping (maintenance): <br /> 1. Tapestry Way Area A <br /> 2. Creekside Area B <br /> 3. Entry Creekside Area C <br /> $16,900.00 <br /> B. Water <br /> 1. All Planting $5,256.00 <br /> C. Power <br /> 1. 2 Controllers $204.84 <br /> D. Reserve/Long-Term Replacement Fund for scheduled long-term <br /> replacement of various district improvements (see note) $849.06 <br /> E. City of Pleasanton Administration Fee $650.00 <br /> SUBTOTAL $23,859.90 <br /> County Fees for Collection of Assessments $405.90 <br /> GRAND TOTAL $24,265.80 <br /> Assessment per Unit (90 units) $269.62 per year <br /> Note: <br /> An existing surplus of approximately $1,100 currently exists for Lighting and Landscape <br /> Maintenance District 1993-1, Windsor, as a significant re-landscaping and irrigation renovation <br /> project was undertaken in 2006, and wrought-iron fence repair and repainting was performed in <br /> 2009. Reserve/replacement funds will be held in an interest bearing account until needed for <br /> future repairs or replacement of entry walls, signage, irrigation systems, landscaping or other <br /> District features. <br /> 4 <br />