My WebLink
|
Help
|
About
|
Sign Out
ORD 2100
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
6/6/2014 8:25:41 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
6/3/2014
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2100
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
91. The building permit and improvement plans for this development shall contain <br /> signage and striping plans that are subject to the approval of the City Traffic <br /> Engineer. <br /> 92. All dry utilities (electric power distribution, gas distribution, communication service, <br /> Cable television, street lights and any required alarm systems) required to serve <br /> existing or new development shall be installed in conduit, underground in a joint <br /> utility trench unless otherwise specifically approved by the City Engineer. <br /> 93. The encroachment permit for haul route for all materials and equipment to and <br /> from this development shall be approved by the City Engineer prior to the <br /> issuance of any permit by City Building Division or Engineering Division. <br /> 94. Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at full expense to <br /> the project developer. This shall include slurry seal, overlay, or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> Livermore-Pleasanton Fire Department <br /> 95. All commercial, industrial, and multi-family residential occupancies shall have <br /> valve tamper and water flow connected to an Underwriters Laboratory (UL) listed <br /> Central Station Service. Fire Department plan check includes specifications, <br /> monitoring certificate(s), installation certificate and alarm company U.L. <br /> certificate. Fire alarm control panel and remote annunciation shall be at <br /> location(s) approved by the Fire Prevention Bureau. <br /> 96. Fire alarm control panel and remote annunciation shall be at location(s) approved <br /> by the Fire Prevention Bureau. All systems shall be point identified by individual <br /> device and annunciated by device type and point. <br /> 97. The project developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> 98. Prior to any construction framing, the project developer shall provide adequate fire <br /> protection facilities, including, but not limited to a water supply and water flow in <br /> conformance to the City's Fire Department Standards able to suppress a major <br /> fire. <br /> 99. All fire sprinkler system water flow and control valves shall be complete and <br /> serviceable prior to final inspection. Prior to the occupancy of a building having a <br /> fire alarm system, the Fire Department shall test and witness the operation of the <br /> fire alarm system. <br /> 100. Should any operation or business activity involve the use, storage or handling of <br /> hazardous materials, the firm shall be responsible for contacting the LPFD prior to <br /> 16 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.