Laserfiche WebLink
runoff must be covered as deemed appropriate by the City Engineer/Chief <br /> Building Official and as required by the State Water Board. - <br /> c. All metal roofs, if used, shall be finished with rust-inhibitive paint. <br /> d. Roof drains shall discharge and drain away from the building foundation. Ten <br /> percent of the stormwater flow shall drain to landscaped area or to an unpaved <br /> area wherever practicable.. <br /> Construction Requirements <br /> 95. The Construction General Permit's construction requirements include, but are not <br /> limited to, the following: <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/docs/finalconstpermi <br /> t.pdf <br /> Stormwater <br /> a. The project developer shall submit a Stormwater Pollution Prevention Plan <br /> (SWPPP) for review by the City Engineer/Chief Building Official prior to issuance <br /> of building or engineering permits. A reviewed copy of the SWPPP shall be <br /> available at the project site until engineering and building permits have been <br /> signed off by the inspection departments and all work is complete. A site specific <br /> SWPPP must be combined with proper and timely installation of the BMPs, <br /> thorough and frequent inspections, maintenance, and documentation. Failure to <br /> comply with the reviewed construction SWPPP may result in the issuance of <br /> correction notices, citations or stop work orders. <br /> b. The amendments to the SWPPP and all the inspection forms shall be completed <br /> and available at the site for inspection by the city, county or state staff. <br /> c. The project developer is responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable <br /> measure, shall be included in the SWPPP and implemented as approved by the <br /> City. <br /> d. The project developer shall include erosion control/stormwater quality measures <br /> on the final grading plan which shall specifically address measures to prevent <br /> soil, dirt, and debris from entering the storm drain system. Such measures may <br /> include, but are not limited to, hydroseeding, hay bales, sandbags, and siltation <br /> fences and are subject to the review and approval of the City Engineer/Chief <br /> Building Official. If no grading plan is required, necessary erosion <br /> controlstormwater quality measures shall be shown on the site plan submitted <br /> for an on-site permit, subject to the review and approval of the Building and <br /> Safety Division. The project developer is responsible for ensuring that the <br /> contractor is aware of and implements such measures. <br /> e. All cut and fill slopes shall' be revegetated and stabilized after completion of <br /> grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary irrigation <br /> system to ensure that the grasses are established before October 15. No <br /> PUD-101 (Kottinger Gardens) City Council <br /> 16of22 <br />