Laserfiche WebLink
Width Requirements <br /> 36 Feet or Greater No Requirements <br /> Between 28 and 36 Feet Post one side <br /> Between 20 and 28 feet Post both sides <br /> Less than 20 feet Not permitted <br /> Aerial Oos -Width Requirements <br /> 42 Feet or Greater No Requirements <br /> Between 34 and 42 Feet Post one side <br /> Between 26 and 34 feet Post both sides_ <br /> Less than 26 feet Not permitted <br /> 82.The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire <br /> mains and fire hydrant locations only. Plan check comments and approvals DO NOT <br /> INCLUDE: <br /> • Installation of the on-site fire mains and fire hydrants. Specific installation <br /> drawings submitted by the licensed underground fire protection contractor <br /> shall be submitted to the Fire Prevention Bureau for approval. <br /> • Backflow prevention or connections to the public water mains. <br /> 83.The proposed building(s) may have additional Fire Department requirements that <br /> can only be addressed by knowing the details of occupancy. These occupancy <br /> details shall be submitted to the Fire Department prior to submittal of construction <br /> plans to the Building Department. Details shall include but not be limited to the <br /> following: <br /> A. Type of storage <br /> B. Height of storage <br /> C. Aisle spacing <br /> D. Rack of bulk storage <br /> E. Palletized storage <br /> F. Type of occupancies within areas of the building(s) <br /> Based on the information received, there may be additional requirements such as: <br /> smoke and heat venting, in-rack sprinklers, increases in sprinkler design criteria, <br /> draft curtains, etc. <br /> Building <br /> 84.At the time of building permit plan submittal, the project developer shall submit a <br /> final grading and drainage plan prepared by a licensed civil engineer depicting all <br /> final grades (with accurate elevations above sea level indicated) and on-site <br /> drainage control measures to prevent stormwater runoff onto adjoining properties. <br /> 85.Prior to issuance of building or demolition permits, the applicant shall submit a waste <br /> management plan to the Building and Safety Division. The plan shall include the <br /> estimated composition and quantities of waste to be generated and how the project <br /> developer intends to recycle at least 75 percent of the total job site construction and <br /> PUD-85-02-02D-06M, Lexus of Pleasanton Page 14 of 24 <br />