Laserfiche WebLink
2. 4138 Vineyard Avenue Parcel—0.51 acres <br /> This parcel is located northwest of the existing Kottinger Place site and is currently <br /> vacant. It was purchased by the City of Pleasanton in February 2011 with the <br /> redevelopment of Kottinger Place in mind. <br /> 3. 4133 Regalia Court—0.50 acres <br /> This parcel is adjacent to the Kottinger Place and Vineyard Avenue parcel, and is <br /> the site of the Regalia House; an unused (due to lack of structural integrity) <br /> community facility with parking. The Regalia House has suffered structural damage, <br /> is in poor condition and is scheduled for demolition. The proposed parcel is <br /> currently a part of Kottinger Village Community Park and is owned by the. City of <br /> Pleasanton. <br /> 4. 251 Kottinger Drive (Existing Pleasanton Gardens) — 1.95 acres <br /> Pleasanton Gardens is located directly across Kottinger Drive from the other three <br /> project parcels and is currently improved with 40 affordable senior homes developed <br /> in 1970. The site and its improvements are currently owned by Pleasanton Gardens, <br /> Inc., a nonprofit entity set up by four local churches in the 1960's. It has many of the <br /> same design issues and critical needs as Kottinger Place. In addition some of the <br /> existing buildings were constructed over a City storm drain culvert and the site has <br /> had drainage issues in the past. <br /> If the project is approved, the four parcels will be combined into two parcels under the <br /> single-ownership of the City of Pleasanton. During this process, the Regalia Court <br /> parcel will also be separated from the existing Kottinger Village Community Park parcel <br /> of which it is currently a part. <br /> The uses surrounding the proposed project site consist mainly of existing single-family <br /> and multi-family residences of varying ages. This is especially true to the north, south, <br /> west, and the eastern edge of the southern portion of the proposed project site. Along <br /> the eastern edge of the northern portion of the proposed project site is the existing <br /> Kottinger Village Community Park, which is a small community park. <br /> Page 4 of 13 <br />