Laserfiche WebLink
'INTRODUCTION <br /> Table is List of Investments <br /> Investment Amount %of Total <br /> type Category Project/Program (9 x millions) Funds <br /> I-80 Gilman Street Interchange <br /> 1-80 improvements $24.00 <br /> Improvements 1-80 Ashby Interchange improvements $52.00 <br /> Subtotal $76.00 <br /> SR-84/1-680 Interchange and SR-84 <br /> $122.00 <br /> Widening <br /> SR-84 SR-84 Expressway Widening(Pigeon Pass <br /> Improvements to Jack London) $10.00 <br /> Subtotal $132.00 <br /> 1-580/1-680 Interchange improvements $20.00 <br /> 1-580 Local Interchange Improvement <br /> -580 Program:Interchange improvements— <br /> Improvements Greenville,Vasco,Isabel Avenue(Phase 2); $28.00 <br /> Central County 1-580 spot intersection <br /> improvements <br /> Subtotal $48.00 <br /> 1-680 High Occupancy Vehicle/Toll <br /> 1-680 (HOV/HOT)Lane between SR-237 $60.00 <br /> Traffic Improvements and Alcosta 8% <br /> Relief on Subtotal $60.00 <br /> Highways 1-880 NB HOV/HOT Extension from A St. <br /> (9%) to Hegenberger $20.0 <br /> 1-880 Broadway/Jackson mtiltimodal <br /> transportation and circulation $75.0 <br /> improvements <br /> Whipple Road/Industrial Parkway <br /> Southwest Interchange improvements $60.0 <br /> -880 1-880 Industrial Parkway Interchange <br /> Improvements $44,0 <br /> improvements <br /> 1-880 Local Access and Safety:Interchange <br /> improvements at Winton Avenue; <br /> 23rd/29th Ave.,Oakland;42nd Street/High $85.00 <br /> Street;Route 262(Mission)improvements <br /> and grade separation;Oak Street <br /> Subtotal $284.00 <br /> Highway Capital Subtotal $600.00 <br /> Projects <br /> Freight& Freight and economic development <br /> Economic $7740 1% <br /> Development program <br /> TOTAL $677.40 9% <br /> Notes:Priority implementation of specific investments and amounts for fully defined capital projects and phases will be <br /> determined as part of the Capital Improvement Program developed through a public process and adopted by the Alameda CTC <br /> every two years and will include geographic equity provisions. <br /> All recipients of sales tax funds will be required to enter into agreements which will include performance and accountability <br /> measures. <br /> 7t w`4yk,^'..m - .µ47n'. •k5w, r,'"4".1139nttvas <br /> ,� -._ • <br /> ;zoi4 Alameda County Transportation Expenditure Plan I 5 <br />