My WebLink
|
Help
|
About
|
Sign Out
20 Attach 1 and 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
050614
>
20 Attach 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 4:15:05 PM
Creation date
4/30/2014 11:19:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/6/2014
DESTRUCT DATE
15Y
DOCUMENT NO
20 ATTACHMENTS 1 and 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
measures shall be maintained until such time as permanent landscaping is <br /> in place. <br /> iii. Gather all sorted construction debris on a regular basis and place in the <br /> appropriate container for recycling; to be emptied at least on a weekly <br /> basis. When appropriate, use tarps on the ground to collect fallen debris <br /> or splatters that could contribute to stormwater runoff pollution. <br /> iv. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and <br /> equipment off paved or graveled areas during wet weather. Broom sweep <br /> the street pavement adjoining the project site on a daily basis. Scrape <br /> caked on mud and dirt from these areas before sweeping. <br /> v. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> replace filter materials to ensure effectiveness and to prevent street <br /> flooding. <br /> vi. Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the <br /> site that have the potential of being discharged into the storm drain system <br /> by being windblown or by being spilled. <br /> vii. Never clean machinery, equipment, tools, brushes, or rinse containers into <br /> a street, gutter, or storm drain. <br /> viii. Ensure that concrete/gunite supply trucks or concrete/plaster operations <br /> do not discharge wash water into a street, gutter, or storm drain. <br /> ix. Equipment fueling area (if used at the construction site): use a designated <br /> area away from the storm drainage facility; use secondary containment <br /> and spill rags when fueling; discourage "topping off' of fuel tanks; place a <br /> stockpile of absorbent material where it will be readily accessible; check <br /> vehicles and equipment regularly for leaking oils and fuels; and dispose of <br /> rags and absorbent materials promptly and properly. Use of an off-site <br /> fueling station is strongly encouraged. <br /> x. Concrete wash area: 1) locate wash out area away from storm drains and <br /> open ditches; 2) construct a temporary pit large enough to store the liquid <br /> and solid waste; 3) clean the pit by allowing concrete to set; 4) break up <br /> the concrete; and then 5) recycle or dispose of properly. <br /> xi. Equipment and vehicle maintenance area is not permitted; use of an off- <br /> site repair shop is strongly encouraged. <br /> PUD-98, CarMax Auto Superstores Page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.