My WebLink
|
Help
|
About
|
Sign Out
20 Attach 1 and 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
050614
>
20 Attach 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 4:15:05 PM
Creation date
4/30/2014 11:19:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/6/2014
DESTRUCT DATE
15Y
DOCUMENT NO
20 ATTACHMENTS 1 and 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
consultation. Completion of the nesting cycle shall be determined by a qualified <br /> ornithologist or biologist, as determined by the City. <br /> The buffer zone shall be delineated by highly visible temporary construction <br /> fencing, and no intensive disturbance (e.g., heavy equipment operation <br /> associated with construction, use of cranes or draglines, new rock crushing <br /> activities) or other project related activities that could cause nest abandonment <br /> or forced fledging, shall be initiated within the established buffer zone of an <br /> active nest. <br /> If the project is built in phases, this condition of approval shall be implemented <br /> for each phase of development. <br /> 68. In accordance with measure HZ-2.1, prior to initiation of any on-site <br /> construction activities, the project developer shall contact the Underground <br /> Service Alert (USA) whose purpose is to receive planned excavation reports <br /> from public and private excavators and to transmit those planned excavation <br /> reports to all participating excavation. The USA will contact local utilities and <br /> inform them that construction is about to begin in their service area. This notice <br /> allows local utilities to mark the areas where their underground facilities are <br /> located near the construction site so that they may be avoided during project <br /> construction. <br /> 69. In accordance with measure HZ-2.1, prior to construction activities within 50 feet <br /> of the PG&E gas line, the project contractor shall identify and demarcate the <br /> location of the natural gas pipeline using highly visible markers that will <br /> remain in place throughout project construction in the vicinity of the pipeline <br /> and ensure that all construction workers are aware of the location of the line. <br /> The location of the pipeline shall be noted on the site and construction plans. <br /> Further, the project contractor shall take all appropriate measures necessary to <br /> ensure that the line is not disturbed. <br /> 70. In accordance with measure HZ-2.1, the project developer shall develop an <br /> emergency response plan prior to construction that will include response <br /> measures in the event that there is disturbance of any underground utilities. <br /> The plan will be subject to review and approval by the Building and Safety <br /> Division and/or City Engineer. <br /> 71. In accordance with measure HY-1.1, and in accordance with the applicable <br /> provisions of the Municipal Regional Permit (MRP)-NPDES Permit, <br /> implementation of and compliance with the stormwater quality BMPs are <br /> required. However, to ensure that implemented BMPs are effective for <br /> reducing potential pollutant loads to a sufficient level of protection, each project <br /> developer shall prepare and implement a site-specific Water Quality <br /> Management Plan (WQMP) with BMPs targeted to reduce post-construction <br /> pollutants listed in Table 3.5-5 of the EIR. <br /> PUD-98, CarMax Auto Superstores Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.