v. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to <br /> retain any debris or dirt flowing in the storm drain system. Maintain <br /> and/or replace filter materials to ensure effectiveness and to prevent <br /> street flooding. <br /> vi. Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the <br /> site that have the potential of being discharged into the storm drain <br /> system by being windblown or in the event of a material spill. <br /> vii. Never clean machinery, equipment, tools, brushes, or rinse containers <br /> into a street, gutter, or storm drain. <br /> viii. Ensure that concrete/gunite supply trucks or concrete/plaster operations <br /> do not discharge wash water into a street, gutter, or storm drain. <br /> ix. Equipment fueling area: use a designated area away from the storm <br /> drainage facility; use secondary containment and spill rags when fueling; <br /> discourage "topping off' of fuel tanks; place a stockpile of absorbent <br /> material where it will be readily accessible; check vehicles and <br /> equipment regularly for leaking oils and fuels; and dispose rags and <br /> absorbent materials promptly and properly. Use of an off-site fueling <br /> station is strongly encouraged. <br /> x. Concrete wash area: 1) locate wash out area away from storm drains <br /> and open ditches; 2) construct a temporary pit large enough to store the <br /> liquid and solid waste; 3) clean the pit by allowing concrete to set; 4) <br /> break up the concrete; and then 5) recycle or dispose of properly. <br /> xi. Equipment and vehicle maintenance area: use a designated area away <br /> from the storm drainage facility; always use secondary containment and <br /> keep stockpile of cleanup materials nearby; regularly inspect vehicles <br /> and equipment for leaks and repair quickly or remove from them project <br /> site; and train employees on spill cleanup procedures. Use of an off-site <br /> repair shop is strongly encouraged. <br /> 2. Within 30 days of the installation and testing of the stormwater treatment and <br /> hydromodification facilities, the designer of the site shall submit a letter to City <br /> Project Inspector/Construction Services Manager certifying the devices have <br /> been constructed in accordance with the approved plans for stormwater and C3 <br /> design for the project. The letter shall request an inspection by City staff. <br /> C. Operation and Maintenance Requirements <br /> 29 of 31 <br />